几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 09:28 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 is gypsum board acceptable as diaphragm material

is gypsum board acceptable as diaphragm material?
i am designing a new condo building and have minimal shear wall area on the exterior face of the building. the building has a center corridor which are shear walls and i want to transfer the roof forces back through the ceiling to the corridor walls. is this acceptable? i am looking at the ibc code which gives design values for walls but i don't see anything about diaphragms.
thanks.
this is a bit dated, however, the 1996 sbcci "standard for hurricane resistant residential construction" gives shear values for 1/2" gyp board used in horizontal diaphragm assemblies: table 304c2 gives a recommended shear capacity of 70 pounds per linear foot.
this is based on 1/2" thick material with 5d cooler nails or 1-1/4" drywall screws at 7"spacing at the edges and 10" spacing at intermediate supports.
for what it is worth i would not use drywall for a diaphragm (or a shear wall for that matter) in a damp climate. the humidity makes it very soft where you can't hold a picture up with a nail.
call it over convservative but that is my two cents.
i typically don't design using gwb as a horizontal diaphragm, but i do recognize that it is probably a pretty good one.
how else does the connection between the top of an end wall and the gable end truss above it work? unless you brace the end wall up to the roof diaphragm, using diagonal
in my area the nailing pattern is be hard to obtain. we have used the ceiling 5/8" gyp interior diagrams at gables, but it takes extra efforts.
if interior gyp is getting damp, consider getting a new roofer.
add bracing in the trusses to transfer the forces down to the interior wall, or better yet take care of it at the exterior face of the building. if your loads are minimal it shouldn't be hard to take care of it the normal way.
its always better to take the standard way out, especially in a litigious building group like condos.
why not sheath your wall with plywood and cover with 1/4" to 1/2" gyp.
mmin- are your roof trusses light gauge or wood? strictly speaking for either material i don't think ibc recognizes using gyp in a diaphragm. the version i have (2000) lists only wood structural panels or diagonal sheathing as acceptable as a diaphragm for wood construction. ibc doesn't say anything about diaphragms for light gauge framing(section 22). (might this be an oversight? i think it is.) however hud has published test data on osb and plywood diaphragms in light gauge construction, see
my original design used a limited area available on the exterior face for a beefed up shear wall segment. a site inspection however revealed that there was a large hole cut in these panels for process air for a heat pump unit installed behind it leaving the shear panel useless. i am left with designing field modifications to correct this issue. my hope is that by increasing the number of screws to the 5/8" gypsum i can provide a "simple" fix.
the trusses are wooden. i have considered bracing from the ridge to the walls but the trusses have a truss at the ceiling level combined with the roof truss members. i am not sure about fitting braces through the
fyi
this topic is addressed in the 2003 version of the ibc - section 2508.5 there is an evaluation report by the gypsum association at
i would not use it in my area which is florida. during hurricanes and in many instances roof membranes are breached. this will create water leaks. the concern is if there is ever any water intrusion on the gyp board, then you will lose any rigidity.
regards,
lutfi
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
gypsum roof huangyhg 产品功能分析 0 2009-09-09 03:37 PM
material specs on mechanical drawings huangyhg 精密机械 0 2009-09-05 11:10 PM
material not being supplied with certs - general market tren huangyhg tec-ease(America) 0 2009-09-05 11:38 AM
material callouts huangyhg tec-ease(America) 0 2009-09-05 11:37 AM
【转帖】material not being supplied with certs - general market tren yang686526 American standards 0 2009-04-29 08:46 PM


所有的时间均为北京时间。 现在的时间是 06:03 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多