几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 10:10 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 lg top track as distribution member

lg top track as distribution member
i was looking at using a light gage top track to distribute loads to load bearing stud walls, which i have never even explored before. in looking at deep leg tracks (user defined as 600t400-68 and 600t600-68 in the programs that i have), you find out that those types of tracks have all kinds of capacity in positive moment (legs of track in tension), which is enough to distribute the loads to the studs if the track would be put in place as a number of individual segments.
on the other hand, the negative moment capacity of the track (with the legs of the track in compression) is like 1% of the capacity of the positive moment noted above. is there any way to neglect this in the design of the top track, since the positive moment capacity is enough to distribute the load to the studs. or since you have a negative moment overstress you have a failure, causing the legs of the track to distort, etc.
has anybody ever explored this.
thanks for any input.
usually you use a tube or angle of some sort to transfer the load to the nearest studs. here's a couple of previous threads that discusses this subject:
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
laterally supported top flange huangyhg 产品功能分析 0 2009-09-10 09:59 AM
gymnasium running track deflections huangyhg 产品功能分析 0 2009-09-09 03:35 PM
double top plate on stud wall huangyhg 产品功能分析 0 2009-09-08 07:25 PM
design load distribution member1 huangyhg 产品功能分析 0 2009-09-08 05:26 PM
concrete tank moment distribution huangyhg 产品功能分析 0 2009-09-08 12:54 PM


所有的时间均为北京时间。 现在的时间是 08:02 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多