几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 11:21 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 loads for roof design - double roof

loads for roof design - double roof?
since the ibc 1510.3 allows one reroof before old roofs must be removed, do you design a new building for the weight of two roofs? i have never seen an engineer do this, but it seems prudent.
yes
reroofing is possible only in certain types, most commonly built-up roofing. for built-up type roofing, we typically include the weight of reroofing in design (three if directed by the owner).
2001 california building code (modified 1997 ubc) section 2316a.2 table 2.3.2 footnote 3 is somewhat related to your question (this is for wood construction only). the load duration factor (cd) is listed as 1.25 on the table, but the footnote is saying that this value can be used only if the dead load includes the weight of at least one reroofing. otherwise cd shall be 1.15.
you design the roof for whatever loads it is expected to see. that may or may not include a re-roof. often engineers add in some extra load for contingency or just round up, such as using 20psf for roof dead load when the actual load may only be 15 or 17 psf. that extra 3 psf may compensate for the weight of some extra tar, paper, shingles, or whatever.
the other side of the coin is that if you tell your client that they can re-roof without retrofit, then they get upset about having paid the extra cost for overdesigning the thing in the first place. client: "well for how much of my buidling did i over pay because you over designed it?" sometimes that can lead to more issues than just a bad phone call.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
design build huangyhg 产品功能分析 0 2009-09-08 05:13 PM
asce figure 6-10 wind loads huangyhg 产品功能分析 0 2009-09-07 01:22 PM
【转帖】模拟南方软件下polyline线的输入(并进行修改),不敢独享 - 精华帖集合 yang686526 ObjectARX(VB.NET/C#) 0 2009-04-29 05:37 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 10:34 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多