默认 masonry cracks and leaks .. also wideslab design

masonry cracks and leaks .. also wideslab design
we are in a tropical country and experiences lots of rainfall... our usual problems about masonry are masonry cracks and also leaks especially on the interface of solid concrete and masonry. any suggestions?
also, can anybody help me in the design of wideslabs? wideslabs are precast slabs poured half ( or less ) and installed on the structural frame. the slab will then be used as a form on which the on site concrete will be poured. the slab will ultimately become a part of the structure. this can be done both as a prestressed or conventional way. i'm interested on the conventional method using wire mesh girders.
find a job or post a job opening
from my experience the slabs are designed as either prestressed or reinforced concrete slabs for the total depth. the wire mesh girders are used to give the slabs the capacity to span between supports until the insitu topping is poured. they also provide continunity between the precast and insitu concrete. if you are using a prestressed slab you will need to be careful at the transfer of prestress into the slab as the flat depth could cause the slab to snap due to the prestressing force
as for the masonry do you construct your buildings in cavity construction ?
kieran
in ages past we used a greater proportion of lime in masonry mortars. this produced:
- greater workability in the plastic mortar,
- greater flexibility in the set mortar (therefore fewer cracks) and
- greater ability to self heal the cracks that did form.

suitable proportions of cement:lime:aggregate are:
1:1:6 for conditions of severe frost and exposure
1:2:9 for most normal work in exposed conditions
1:3:12 for internal work only
mortars for structural work should, of course, be properly specified from the appropriate codes.
properly detailed contraction joints at suitable intervals in masonry walls will allow the cracks to be dealt with at the design stage.
if all else fails, make sure you have plenty of silicone mastic.
proper expansion joints between the concrete and the masonry are crucial, and can be retro-fitted. single-wythe masonry will always be a problem in wet areas, so the best solution is to add a veneer with a cavity to control the water infiltration. also check roof parapets, since this is an easy place for water penetration.
all,
thanks!!!! i'll try the options you have suggested for our r&d evaluation.
kieran,
by cavity construction, if you mean two separate chb walls... we are using only one; filled with mortar... usually using 6" thk. or sometimes evg / 3d panels.
other suggestions still appreciated when available.
ksd
dear ksdphilippines,
a beam of 150mm. depth and thick ness same as wall will help to prevent the dampness to enter.for already existing building the cracked portion , the plaster is removed racked about 100mm on both sides of the crack fix a chicken wire mesh and cover it with 1:3 plaster.this will invariabley keep the moister away.
pechetty.
i have done used pechetty's method countless times here in tanzania.in 50% of the cases the plaster cracks not at the treated joint, but where the chicken mesh ends!the most effective method is plastering the crack on one side and finishing up on the opposite side the next.wait a few days for curing.you should get a "trained" crack which can be treated with a flexible mastic.basically it will not be an eyesore.
regards mooslim
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
foundation cracks in slab on sand huangyhg 产品功能分析 0 2009-09-09 01:24 PM
drywall cracks in 40 year old home huangyhg 产品功能分析 0 2009-09-08 07:51 PM


所有的时间均为北京时间。 现在的时间是 05:42 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多