几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 02:04 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 min. number of ladder per platform

min. number of ladder per platform
we are designing support platform about 23 ft above ground for cooling towers. i am assuming that required number of caged ladder depends on size of platform. any references? i have searched osha w/o success.
thanks,
ibro v.
check out our whitepaper library.
osha may not say how many ladders you need(maybe two would be good), but osha will say how the ladders will be designed as wel as the platform.
richard a. cornelius, p.e.
i'm not aware of a specific requirement either. tank roofs normally have 1- ladder regardless of size, for example.
as i recall, osha does specify that if used regularly (ie, daily), a stairway should be used rather than a ladder.
have you looked at nfpa 214?
means of egress is discussed in ohsa 1910.35 - 37 (subpart e). design details for ladders is discussed in 1910.27. if the platform is just for operations and/or maintenance to the cooling towers i would think only 1 ladder is required. if the platform is part of a route for plant personnel to exit the area during an emergency then the platform is part of the means of egress and i don't think you could even use a ladder, you would have to use stairs.
nfpa-101-2000 (life safety code)sections 7.2.9.1 (3) and 40.2.2.10 allows ladders as a means of egress to platforms whose intended occupancy doesn't exceed 3 people at any one time.
2 is more popular for us if a platform has signifcant sizes (e.g. 20ft or larger), for access and egress purposes. usually, the number is req'd or determined ay piping or clients.
in process plants, lots of cases, platforms are interconnected by ladders and stairs, no platform is a dead end.
for a "room" meaning any where more than i think 10 people work requires 2 means of egress, fire code.
richard a. cornelius, p.e.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
ansi 9standards0 code issues - standard part number for huangyhg American standards 0 2009-09-05 05:47 PM
drawing number system - do you still indicate dwg sie in the huangyhg tec-ease(America) 0 2009-09-05 10:30 AM
【转帖】drawing number system - do you still indicate dwg sie in the yang686526 American standards 0 2009-04-29 07:45 PM
请帮忙解决以下这个程序不能运行的问题,谢谢 yang686526 ObjectARX(AutoLISP) 0 2009-04-27 12:34 PM
【转帖】how can i insert the serial number note yang686526 SolidWorks二次开发 0 2009-04-12 09:08 PM


所有的时间均为北京时间。 现在的时间是 07:55 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多