几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 03:20 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 movement join

movement joint
hi,
question about movement joints:
what should be the minimal distance between movement joints for the reinforced concrete slab on the ground (thickness-150mm)
thanks
150%-200% of the thermal expansion/contraction distance.
please, what is the thermal expansion/contraction distance of a 150mm-thick reinforced concrete slab?

the thickness is irrelevant,(the joint goes through it), the length and width of the slab are the important dimensions and expansion is roughly 5/8" per 100 degrees f of temperature change per 100 feet of length.
my answer was for width of expansion joint. the spacing can be whatever is convenient.
control joints and construction joints are normally 20-25 times the thickness of the slab, (10 feet to 12.5 feet).
mammut,
i do not agree with the advice given by civilperson to place control or construction joints 10 to 12.5 ft apart. more normal practice is to use in the order of 20 ft or 6 metre spacings. joints are the main problem area for slabs on ground, so more joints is not necessarily better.
expansion joints are not usually required, as natural shrinkage of the concrete provides plenty of space for the concrete to expand into when hot.
i agree that joints are the main problem for gound bearing slabs. the number of construction joints will depend on the casting method, which may also depend on the flatness requirement.
what is your slab for? how do you intend to cast it?
i have previously worked on a 150m x 50m factory floor slab that we cast in 3nr 50 x 50m bays, no expansion joints just 2 construction joints. we achieved a good finish.
==>zambo
i have similar situation: factory floor - 120x40m.
it will be casted in 4 bays -40*30m
mammut,
by what method will you cast the slab? your bay width of 30m means that you cannot span a levelling beam between the side forms. tis means that you will need to use a lazer level and then spot check the concrete level as you proceed.
zambo:
i assume you have reinforcing accross the construction joints. what was your casting sequence - in series, or skip the middle (cast earliest or the last)? did you have saw cut control joints after curing?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
masonry control join huangyhg 产品功能分析 0 2009-09-10 12:31 PM
expansion plus movement join huangyhg 产品功能分析 0 2009-09-09 09:12 AM
definition of expansion join huangyhg 产品功能分析 0 2009-09-08 04:44 PM
crack movement gauges anyone know about them huangyhg 产品功能分析 0 2009-09-08 02:21 PM


所有的时间均为北京时间。 现在的时间是 11:24 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多