几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 11:40 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 patching structural slabs

patching structural slabs
lets say you have a structural slab supported on grade beams and piles. after time, the soil immediately under the slab has settled some feet. a new owner takes the building, and wants to trench the slab to run new plumbing.
initially, the plumbing was installed, then hangers were cast into the slab to hold up the plumbing.
how do you hang new plumbing from the existing slab and then recast the trenched piece?
if it is a "structural slab" actually spanning from beam to beam i would be careful about "trenching" through it.
you should first try to get access to the space below - this can be via excavations if necessary. the new hangers could be attached with expansion bolts, expansion-threaded inserts, power driven fasteners or concrete screws (like hilti's kwik-con screw). other access could be created by cutting a small square opening in the slab at an advantageous point and excavating fromt there to get the pipes in. the opening may have to be reinforced as you have cut through primary reinforcing.
otherwise, cutting through a structural slab must be carefully laid out by the engineer to minimize loss of strength. for a one-way slab, this could be a longitudinal slot parallel to the direction of the span of the slab. but i would avoid this as much as possible.
ah, jae, you know as well as i do that the cuts will always be perpendicular to the reinforcement!!!
lets say you can cut a hole and get underneath to install your new plumbing hangers. how would you then patch that hole? how do you form your bottom part of the slab when you have no access to underneath the slab? maybe a piece of plywood underneath hanging from a couple vert. steel rods which are supported by a 2x4 across the opening? then grind the rods down after the concrete has cured??
yes, that would work...
how about this:
when they cut the opening, have them shave all four of the edges of the opening back at an angle, perhaps 30 degrees from the vertical...so your new concrete fill would be set in the opening like a keystone.
then, have them bolt or screw a couple of angles across the opening - the angles would be sized to take the vertical load of the patch. the top of the angles would be flush with the bottom of the slab and the angles could extend past the opening edges far enough so that the bolts/screws would be secured to competent concrete (away from the opening edges. the angles could be located parallel to two edges of the opening such that a workman could still get access between the angles to make the bolt/screw connection to the bottom of the slab underneath (a little gymnastics but can be done)
then set a steel plate across the angles. the plate would span from angle to angle. add wwf if desired and place the new concrete. the new concrete will be supported by a combination of the angles/plate and the tapered edges around the perimeter.
otherwise, can't you get on your knees, fold your hands, and plead, "please, please please don't cut my precious rebar!!!!"
pylko,
your client may also be best served if you make the opening permanent so that future plumbing or other access requirments can be easily accomplished.
you can usually find a location that minimizes the structural and architectual impacts - like under stairs, locker rooms etc. this would require some structural strengthening, and if a single access opening is all that is need to undertake the require plumbing upgrade, the strengthening may be a small cost of the overall scope of work.
just a thought.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
limits of practice for civil vs structural engineers huangyhg 产品功能分析 0 2009-09-10 10:39 AM
how to handle see structural drawings huangyhg 产品功能分析 0 2009-09-09 05:48 PM
geotechnical info on structural drawings huangyhg 产品功能分析 0 2009-09-09 02:31 PM
floor slopes in structural slabs huangyhg 产品功能分析 0 2009-09-09 12:50 PM
dimensions on structural drawings huangyhg 产品功能分析 0 2009-09-08 06:51 PM


所有的时间均为北京时间。 现在的时间是 12:58 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多