几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 11:51 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 pe sealingstamping of lp drawings

pe sealing/stamping of l&p drawings
are ladder and platform (l&p) drawings required to be stamped or sealed by a professional engineer in the states of indiana, lousiana and texas?
the l&p's are attached to a nonbuilding structure (asme pressure vessel).
if the work in question constitutes engineering and isn't exempt for one reason or another, then the state engineering laws would require it.
thanks for the reply jstephen. the reason i asked the question about sealing or stamping is that i wanted to confirm if the platforms attached to the vessels are considered non-exempt structures in the states mentioned.
let me rephrase the question. are platforms attached to vessels considered "exempt structures" in the states of indiana, louisiana and texas? none of the platforms exceed 250 sq. ft. platforms are located at different elevatons and the highest platform is located at 220 ft. from grade. the platforms are for private use and are mostly used during plant maintenance or shutdown and occasionally used during plant operation. platforms have been designed and calculated to meet safety (osha) and building codes (ibc & asce). the question now is whether the platform drawings need to be sealed or stamped by a professional structural engineer in the local jurisdiction
i'd appreciate very much if somebody could post the link to the local building authority in indiana, texas & louisiana. one would have peace of mind if the drawings are sealed/stamped, but if it is not really required, why the hassle of doing it.
thanks.
you should call the state boards and ask them:
the boards will undoubtedly say "yes" but the fact is - if no building permits are pulled which might be the case for a retrofit or new work in an established industrial site - no one will ever care.
however - for your protection - you might want to get it done - regardless.

the industry excemption to stamping and sealing apply to louisiana and texas. whiting, indiana refineries are also not stamped.
as i understand it, the industrial exemptions would apply for refineries doing their own work. if outside engineers are doing engineering for them, that is not exempt.
read the law. third party contractors working for the refinery are expressly mentioned.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
dots requiring pe stamps on shop drawings huangyhg 产品功能分析 0 2009-09-08 07:18 PM
dimensions on structural drawings huangyhg 产品功能分析 0 2009-09-08 06:51 PM
certification of shop drawings huangyhg 产品功能分析 0 2009-09-07 11:16 PM
itile block huangyhg tec-ease(America) 0 2009-09-05 01:23 PM
【转帖】itile block yang686526 American standards 0 2009-05-04 10:45 AM


所有的时间均为北京时间。 现在的时间是 09:49 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多