默认 pile cap reinforcing

pile cap reinforcing
i have been consulted to review the following situation. here is what i have. a square pile cap 8'-6" x 8'-6". the piles are on a 4'-6" square pattern with 2' from pile to edge and 18" round concrete piles extending 4" into the cap. the pile cap is 3' thick with reinforcing 2" clear above the top of the piles. apparently, the bar detailer did not pick up on the 180 degree hooks for the reinforcing which is 9-#8 ea. way. these caps were poured with this "straight" reinforcing. i have a set of plans and am just beginning to chase down the loads that are involved. w14 steel columns bear directly (grout) on top of the cap. i am at a loss as to how this slipped through the cracks, and the several sets of eyes that should have caught this. is there any remedy other than tearing these out and replacing? i should add that 6-#8 and 1-#9 extend from the piles to near the top of the cap.
check out our whitepaper library.
you may not need the hooks. from the information you gave, it seems as though you have enough development length for a straight bar.
i think you may have a problem.
9#8 seems high for an 18" conc pile. i've often used a single 20m (like a #6) for 18" and 15m for 16" unless there is flexure involved. if the load is axial compression only, the concrete bearing at the pile/cap interface should be adequate to transfer the load.
dik
all buildings have to resist lateral load. if a pile foundation is used, each pile in the pile caps that resist the lateral load will have moment in them, due to that lateral load.
the pile cap had 9-#8 each way, at what location? i am visualizing reinforcement in two mats top and bottom, but that is not exactly what you said.
at any rate, the only fix i can think of is to convince yourself you don't need the 180 degree bends. if signicant bending or tension is being transferred from the column, it might be hard to convice yourself of that. compression only? that might be easier to swallow. maybe not all will have to be replaced?
lkjh345 is correct.
sorry... cap rebar not pile rebar...
if the ends of the #8 bars are within two inches clear of the side walls, then chipping in 4-5" will expose enough bars to weld a cross bar for a mechanical development of the existing bars. cast back a repair cover and leave the majority of the pile cap intact.
thanks for the prompt replies and advice.
civilperson: the plans (who looks at those anyway?) call for 2.5" clear. i am leaning toward a solution such as this.
what's the moment at the face of the column, and is there enough development to that point? it seems that there is plenty to develop the bars. i usually put 90 degree hooks for added safety, but for the most part i've seen straight bars working just fine.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pile cap reinforcing steel huangyhg 产品功能分析 0 2009-09-15 12:22 PM
pile cap and grade beam huangyhg 产品功能分析 0 2009-09-15 12:19 PM
h pile huangyhg 产品功能分析 0 2009-09-09 03:39 PM
h pile to pile cap connection huangyhg 产品功能分析 0 2009-09-09 03:38 PM
acip pile reinforcing design huangyhg 产品功能分析 0 2009-09-07 10:07 AM


所有的时间均为北京时间。 现在的时间是 09:42 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多