几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 01:52 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 post-tensioned beams secondary forces and concordance

post-tensioned beams: secondary forces and "concordance"
does anyone have any experience with concordance? or know of any case studies...
basically concordance is the strategic positioning of your pt strands to eliminate secondary forces...
thanks
find a job or post a job opening
this applies to indeterminate structures only, by the way...there are no secondary forces in a determinate structure, such as a simple-span precast bm...
thanks
is this an academic exercise or a practical design problem? the only time i have ever spent on concordant tendon profiles was in school many years ago. nilson's textbook says this about concordant tendons...
"although use of a concordant tendon in a given instance offers the possibility of simplified analysis, there is little practical advantage in terms of structural behavior. the most economical design in a given case is usually obtained with the steel centroid as high as possible over the supports, and as low as possible near midspan, an arrangement that will not generally result in a concordant tendon."
hippo11
taro has it right. there is no need to try to achieve concordance. there is no problem with inducing secondary prestress reactions, in fact they are often benificial, and using the full drape available in controlling spans normally results in the most economical design.
interesting...thanks guys.
but say you have a two-span pt beam with a parabolic drape in each span---you get a big secondary positive moment at your midspans--this is additive to your dead and live moments at midspan. so it's not worth trying condcordance there? i guess if you did get concordance you would be eliminating your secondary moments but then your resulting drape would not be effective in resisting applied gravity loads?
hippo11,
you applied load bending moemnts in that case are
negative - wl2/8
positive - wl2/14
the prestress has basically the same capacity at both faces, so the positive secondard moments are reducing the very high negative moment and increasing the low positive moment. helps both ways and makes the prestress more efficient.
the only problem comes in when some idiot with flanged beams assumes an unrealisticly wide effective flange width which by calculation creates unrealistically high secondary moments and makes the design very unconservative. some computer programs widely used in america used to and may still do this.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭



所有的时间均为北京时间。 现在的时间是 02:29 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多