几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:12 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 precast box culvert in influence of footing

precast box culvert in influence of footing
i have designed a building with shallow footings. it is in the middle of the campus and the owner has hired another firm to design an underground utility box culvert tunnel. for the most part this is not an issue. however, at one location, the tunnel gets to be within 6 feet of the outside face of the building i am designing. the top of the box culvert is 18 feet below the bottom of my footing. the box culvert will be installed first. i would like to have the box culvert designed to carry the load due to the influence of the footing.
the contractor has suggested dropping the shallow footing down so that neither the footing or the tunnel creates surcharge on the other. in my opinion, it becomes unreasonable to have a shallow footing go from 4' below grade to 27' below grade. to me, this is no longer a "shallow" footing. i am having trouble justifying deep foundations for the four footings that lie close to where the box culvert tunnel will be placed. i am especially troubled by mixing systems and getting differential settlement.
i understand the argument that i need to consider if the building would remain stable is the box culvert needed to be removed/repaired in the future, but at the same time, these are lightly loaded footings (less than 40k each) and i'd argue if there are future issues, appropriate shoring could be designed.
any recommendations on the best way to proceed here?
have the box culvert designed for the appropriate surcharge and have a geotech inspector sign off on the backfill and compaction.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
octagon footing base pressure huangyhg 产品功能分析 0 2009-09-10 04:53 PM
influence of footing huangyhg 产品功能分析 0 2009-09-09 07:35 PM
footing is too small for residential addition1 huangyhg 产品功能分析 0 2009-09-09 01:04 PM
demolition of existing wall footing to install column huangyhg 产品功能分析 0 2009-09-08 05:07 PM
box culvert bridge design huangyhg 产品功能分析 0 2009-09-07 04:33 PM


所有的时间均为北京时间。 现在的时间是 04:49 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多