几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 02:31 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 prefabricated metal frame analysis

prefabricated metal frame analysis
renovation of existing frame that was a prefabricated metal frame with taper column and girder frame supporting thin wall box purlins (severly corroded to be removed).
any suggestions on simple analysis to determine existing frame capacity?
i assume these are tappered portal frames... do you have the original drawings? how much information are you able to obtain? depending on how familiar you are with cold-formed steel and buildings using same for bracing, etc, you may want to read "bracing cold-formed steel structures" by thomas sputo & jennifer l. turner.
if these are pre-engineered metal buildings, they generally have little residual strength above the design values and safety/load factors.
you have to be cautious about any additional dead loading... i was involved in one study where the roof deck was corroded so badly that the new deck and insulation proposed generated $.5m repairs... the building ended up abandoned.
most metal building outfits will not review these... even if originally fabricated by them... they sold it, they built it and that's their involvement.
analysis is very time consuming and plate thickness are incremented by 1/16's of an inch... little slop... and stability issues are also critical due to the long clear spans and changes in moment envelope with varying loads... also have to check original loadings with current loadings. in manitoba they have gone from a 1/30 year return period for loads to a 1/50 year with a subsequent increase in loading...
dik
don't know of a simple analysis. we have analyzed a few of these. we take the shop drawings, if available, and actually imput the members into risa or staad to analyze frame. if we don't have drawings, we field measure, with calipers, the member sizes. that gets expensive. be sure to input the reduced sections due to the corrosion.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
metal building frame analysis huangyhg 产品功能分析 0 2009-09-10 01:35 PM
metal bldg drift w brick veneer huangyhg 产品功能分析 0 2009-09-10 01:34 PM
equivalent frame method for analysis of continuous slabs huangyhg 产品功能分析 0 2009-09-08 10:48 PM
equipment frame analysis huangyhg 产品功能分析 0 2009-09-08 10:42 PM
6-story braced frame analysis huangyhg 产品功能分析 0 2009-09-07 08:53 AM


所有的时间均为北京时间。 现在的时间是 02:22 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多