默认 prestressed precast lift slab capacity

prestressed/ precast lift slab capacity
i am trying to determine the capacity of an existing (1968) precast/prestressed lift slab (24'x24' column spacing). it seems the original engineer did not include some significant equipment loads and my client would like to add some heavier equipment. if there is a simplified method or software out there please let me know how i can acquire it. thank you!!
check out our whitepaper library.
maechh,
i hope that you have access to the original structural drawings.
if the slab was post-tensioned then you can use any current p-t software. i use rapt for 2d analysis and scs-floor for more complex situations where fea is required. i would think that a 2d analysis based upon equivalent frame would be sufficient and adequately able to model the structure.
but you will need to review the original details of the column/floor connection. the shearhead collar connections were often proprietry, with channel, angles and steel adjustment wedges welded permanently after the floor slab elevation was set.
you will need to check aci 318 (if the project is in the us) where the code required a minimum of 2 tendons in each direction through the critical shear section over the columns.
i am sure that you are aware that several lift slab projects collaped during lifting, in both the us and uk.
also, consider that for a p-t floor system built in 1968 with unbonded (?) p-t, depending on the exposure and environment, corrosion may be present in the tendons with possible strand breakages. you may need to do a bit of investigation to see the "real" condition of the structure.
hth
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
post-tensioned beams parallel to slab huangyhg 产品功能分析 0 2009-09-15 01:51 PM
moment in slab huangyhg 产品功能分析 0 2009-09-10 02:57 PM
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
fork lift load on 3 elevated slab huangyhg 产品功能分析 0 2009-09-09 01:16 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM


所有的时间均为北京时间。 现在的时间是 04:31 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多