默认 shop drawings

shop drawings
what procedures are recommended for:
1) stamping a date received
2) stamping a date reviewed
on shop drawings?
does your company do every sheet, just the front sheet or just the transmittal? if just the transmittal, then i would think at a minimum that it should list every sheet and the date issued. if just the front sheet, does it have an index that lists all other sheets?
what are the implications for liability?
jike,
we stamp only the transmittal with 'received', but each drawing sheet is stamped with the review stamp. in this way, you can accept, reject, or request changes by sheet. our review stamp has a place to put the received date as well as the reviewed date.
what i don't like is that we treat manufacturer's cut sheets the same, in effect accepting or rejecting each page of a brochure. i've never worked anywhere that stamped cut sheets in a similar fashion. personally i think it's a liability.
oh, we will also do a partial release (send some of the drawings back), especially if there is a significant problem. in my shop set i like to keep all versions of a shop drawing and mark them by turning the corner over that has the drawing number and putting the most recent drawing on top, approved or not. it's a good way to track submittal status.
we also date stamp the transmittal only and place the review stamp on each drawing. our shop drawing log lists all drawings for a particular sumbittal; date received; reviewed by; date returned; disposition.
we don't review cut sheets on a page-by-page basis. it's all or nothing.
regarding liability, we don't use "approved" any longer. unless a client request specific wording (except approved) we use "reviewed"; "reviewed as modified"; "revise and resubmit", along with a disclaimer that if something doesn't fit it's not our fault. this is sop in bridge construction.
from the perspective of a formwork engineer, it is very frustrating to have a set of plans stamped or noted on only the cover sheet.
shop drawings, for formwork, exist to rectify differences or conceptual problem in the design or in the coordination of the contract drawings.
the changes made and noted on these drawings is to become part of the contract. as such, if a change is noted on a page, but there is no stamp nor signature to associate the markup with, the validity of the markup is in question. the next step becomes a formal rfi which negates the benifit of the shop drawing review process, as there is little point in preparing a shop drawing for submittal if consise reasonable markups or revisions will only be generated in an accountable way with an rfi and rfi response.
it can certainly seem like a blame game or a way shift liability, but the goal and focus must always be to give the customer the product paid for, not always everything he/she wants, but what is guaranteed by contract and what is reasonable above and beyond.
anything that comes in the door in our office is stamped recieved that day. anything reviewed is stamped page by page. specs and generic product data is stamped on the cover page.
all drawings are stamped, dated and initialed or signed. even drawings that do not require a seal are signed such that drawings have a point of genesis, not necessarily to blame, but to fill in pieces of the puzzle should a question arise.
dtgt2002,
i've worked in several states and the only formwork shop drawings i was required to check were for the deck, whether sip or removable forms. again, all bridge work. i've never been asked by a client to check formwork for a substructure, barrier, etc.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
shop drawing dimensions huangyhg 产品功能分析 0 2009-09-15 10:18 PM
engineered shop drawings huangyhg 产品功能分析 0 2009-09-08 10:28 PM
dots requiring pe stamps on shop drawings huangyhg 产品功能分析 0 2009-09-08 07:18 PM
copied cds as shop drawings huangyhg 产品功能分析 0 2009-09-08 01:56 PM
certification of shop drawings huangyhg 产品功能分析 0 2009-09-07 11:16 PM


所有的时间均为北京时间。 现在的时间是 08:04 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多