几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 11:46 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 structural steelconcrete

structural steel/concrete
i have 3 concrete 'pillars' 760mm square about 2-2.5m high.
4 mechanical structures of appox. 1 tonne and with large moving parts (100rpm) is to be placed on these structures with m20 chemical bolts (6) all at least 175mm from edge.
i am thinking we should increase the size of pillar to around 1000mm sq. with new concrete, but old structure is around 50 years old.
i know old and new concrete will not 'fix' to each other but should a 250mm 'casing' supply enough support?
are there likely to be other problems encountered?
find a job or post a job opening
your problem should be more descriptive.
i could not visualize it.
may be you can explain the problem with more details
thanks.
tjb, yekta,
i think the placement of 4 mech. structures on these three rcc columns is important too. isn't it yekta? 50 years old structure is not a matter at all. is there a platform? 760 sq. pillar of 2-2.5 m height is not slender. its a short column. tell us more about reinforcement tjb.
shenoy.
tjb
on the face of it your problem appears to come down to placing a 125mm thick outer skin on your column if i visualise it correctly. are you then asking if the new concrete casing will separate under load from the older column core?
if so then why not view the interface as a construction joint. the connection would require the old column to be scabbled on all faces and probably primed with an adhesive. your detailing of the reinforcement in the casing, especially the links would need to comply with the detailing rules from the appropriate design code as you analyse the new and old columns as one section. you would probably also need to drill and grout the main bars into the base slab at the foot of the column to give sufficient anchorage.
regards
ginger
there's not enough information in your description of the problem to make an engineering recommendation. however, consider demolishing the columns and rebuilding them, if you can. it would probably be less expensive in the long run and there would be fewer unknowns.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
structural ii huangyhg 产品功能分析 0 2009-09-16 11:25 AM
retraining as a structural engineer huangyhg 产品功能分析 0 2009-09-15 06:45 PM
pe structural i or civil huangyhg 产品功能分析 0 2009-09-15 11:54 AM
how to handle see structural drawings huangyhg 产品功能分析 0 2009-09-09 05:48 PM
dimensions on structural drawings huangyhg 产品功能分析 0 2009-09-08 06:51 PM


所有的时间均为北京时间。 现在的时间是 08:43 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多