几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 05:54 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 using building foundation wall as part of stormwater retenti

using building foundation wall as part of stormwater retenti
i am designing a stormwater retention/detention system for a commerical site in florida. i need to retain a large volume of water and the project area is very restricted. i want the foundation engineer to build me a 5 ft foundation wall on two sides of the building that i can use as part of the retention pond. the foundation engineer claims it can't be done but i don't believe him. has anyone ever designed something like this or know where i can find information on this design solution?
check out our whitepaper library.
what was the reason given by the foundation engineer that it couldn't be done?
done it but don't recommend it. water always does nasty things to footing, foundations, etc. over time.
why cant it be designed as a water retaining structure? dont see how it will affect the design life if done properly. never done it or seen it done though. the building foundation would need to be the same level as the bottom of the pond though i would suggest. you post implies the pond is adjacent and deeper.
i have never seen this done as it can affect the bearing calacity of the foundation causing cracking and failure. this is the same reason why we install foundation drains and install downspouts to channel the water away from the foundation. for me, the liability would be far too great. look to another solution here.
the only time i have seen detention tanks used in a building structure was internally in a high rise where the tank was completely enclosed and sealed from the footings.
mike mccann
mmc engineering
it is possible to get design done by engineers with experience on submerged structures (or coastal/water front structures), but the solution could be costly. depending on the soil/groundwater conditions, you may need to install piles, seepage cut-off walls...to prevent soil movement under the foundation.
as mentioned it can be done for a price. the one time i've done it we basically designed the pond as a pool using aci 350 with a lot more reinforcement, zypex in the concrete and a membrane on the pond. can't let the water under the structure or you are asking for problems. also had the geotech provide bearing capacity for saturated soil and sent a nice release of liability letter to the architect for any future water problems. turned out to be a pretty cool though, had some nice water side seating for a restaurant.
assuming that the water retention wall is not one of an occupied basement, i agree that piling would be a very acceptable option here.
mike mccann
mmc engineering
we just had this come up. the civil guy wants the pond elevation to be several feet higher than the finish floor. me no like!

i inspected a house once in kentucky where a cistern to capture rain from the gutters was not only part of the building foundation, it was under the garage slab. it was entirely under the garage, 3 walls reatained earth on the outside and water on the inside, and the four wall was the basement foundation wall. i think the base of the cistern was about 7' below the bottom of the garage slab - i do re
thanks for the responses. the foundation guy admitted that this idea was outside his experience base and he didn't want the liability. from the comments here it looks like a last resort type design solution anyway. he scared the client so bad with the cost to implement that when i spoke to the client later about a different but more costly approach to my stormwater retention problem the client gave me the go ahead no questions asked and said he appreciated me saving him money. i tell you sometimes it pays to get up in the morning.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
in enercalc masonry wall design, what is parapet heigh huangyhg 产品功能分析 0 2009-09-09 07:17 PM
foundation wall tied to s.o.g huangyhg 产品功能分析 0 2009-09-09 01:39 PM
foundation wall 40 feet below grade huangyhg 产品功能分析 0 2009-09-09 01:38 PM
【转帖】asme - where to star yang686526 American standards 0 2009-04-29 07:28 PM
【转帖】creating a reference poin on a surface yang686526 SolidWorks二次开发 0 2009-04-12 08:36 PM


所有的时间均为北京时间。 现在的时间是 05:24 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多