默认 valley gutters modification

valley gutters modification
we have a project in the facility-part scope of work is to correct/repair of old leaky 25 year old 2-9"x14" valley gutter attached side by side separated by 8" expansion joint between gutters of the building bays. the option is to eliminate the existing valley gutter and infill with polyurethane so the water will flow at the surface of newly formed gutter valley over the existing valleys in-filled with poly materials towards the downspout on both ends. the building is 110' height, both bays are equipped with overhead cranes attached to the building frames down below the roof of the 200' bays span and total length of building is 460' long (total length of gutter on one bay). another scope of work is to demo existing 8" expansion joint covering the 8" space between 2-bldg-bays covered with board on each side of the bay to narrow 8" gap to 1.5" and sealed with 4"diameter backer rod secure with silicone then sprayed with polyurethane roofing system (the backer rod will serve as expansion joint).
my 1'st concern is the rigid gap between bays if less that 2" gap is enough for building contraction due to combined building movement for wind load induced, seismic due to vibration of moving overhead crane attached to the building structure and possible foundation settlement? another is the backer rod material on expansion joint. do you think it will hold and last for more that 10 years without ripping, and changing the physical properties?
i will appreciate all feedbacks as soon as possible. thanks.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
snow load in valley huangyhg 产品功能分析 0 2009-09-16 12:03 AM
response modification factor huangyhg 产品功能分析 0 2009-09-15 06:27 PM
post for hip roof huangyhg 产品功能分析 0 2009-09-15 01:38 PM
asce valley drift load accumulations huangyhg 产品功能分析 0 2009-09-07 01:24 PM


所有的时间均为北京时间。 现在的时间是 10:58 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多