几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » Norm Space: Product Automatic Standards - 范数空间:产品自动化标准 » National Standards » American standards
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-04-29, 07:10 PM   #1
yang686526
高级会员
 
注册日期: 06-11
帖子: 14579
精华: 1
现金: 224494 标准币
资产: 234494 标准币
yang686526 向着好的方向发展
默认 【转帖】dates as per asme y14.100-2004

dates as per asme y14.100-2004
had anyone else not relaized that as per asme y14.100-2004 para 4.28, dates on drawings are to be written year-month- day rather than month-day-year? i have always written dates month-day-year, am i the only one?
eng-tips forums is member supported.
i use to write the date year-month-day but was told to change by management because it was not standard to everyday folks.
best regards,
heckler
sr. mechanical engineer
sw2005 sp 5.0 & pro/e 2001
dell precision 370
p4 3.6 ghz, 1gb ram
xp pro sp2.0
nvidia quadro fx 1400
o
_`\(,_
(_)/ (_)
never argue with an idiot. they'll bring you down to their level and beat you with experience every time.
yes, i have seen it. a lot of companies here in the usa refuse to follow it. we tried to follow it at my last company, no go.
chris
systems analyst, i.s.
solidworks 06 4.1/pdmworks 06
autocad 06
okay, so what you are saying is that this is one of those rules that a bunch of people, who live in their own private worlds, sat down and thought "how should we do this?" and without consulting anyone in the real world, came up with a way to do something that is completly different from the way everyone else in the world does it everyday. and as such, everyone has tried to make this work at some point and everytime they have just gone back to doing it "wrong" because they couldn't change everyone else's minds in order to do it "right".
is that about how you all see it?
yes. the people that write the standards wouldn't have a job if they didn't get together to change something.
chris
systems analyst, i.s.
solidworks 06 4.1/pdmworks 06
autocad 06
back in the uk it was day, month, year. i believe this goes for all of europe, not sure about the rest of the world.
this could cause confusion when looking at us documents.
my guess is they chose year month day because no one else does it this way and it would help avoid confusion!
also if you have the date as part of the file name it sorts better this way.
maybe there is an iso convention they are trying to match.
we started using that format when the software we were using was storing it in that format. this way we could pull the date from the pdm system and use it directly to populate the drawing fields.
"wildfires are dangerous, hard to control, and economically catastrophic."
ben loosli
sr is technologist
l-3 communications
hmm. i think the "year first" date format is/was/has always been a military requirement, at least for their internal reports (not sure it ever flowed down to the subcontractors, but i did see it on level 1 drawings if memory serves)? thus its inclusion under the y14.100 "tree" of specifications, which is the ansi continuation of the old dod-std-100, which is the continuation of the predecessor mil-std-100. which is why we (a civilian company with nothing much to do with mil/nav/af/nasa) call out y14.5 on our drawings, not y14.100...
year(4 digit)-month-day is the most logical way (imo) of writing a date. you wouldn't write time as min-sec-hour or sec-min-hour so why suddenly change the format (large to small) when writing a date.
cbl-
if only that was the way that americans as a whole wrote the date. i think it makes the most logical sense, but like anything else that is ingrained practically from birth, i can't see it changing any time soon.
some places use day-month-year. if you see 11-12-06, would you call it dec 11 or nov 12 if you didn't know the system?
yang686526离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
【转帖】asme y14.5m application and general drafting stds yang686526 American standards 0 2009-04-29 06:30 PM
【转帖】asme vs. iso yang686526 American standards 0 2009-04-29 06:28 PM
【转帖】asme standards for yang686526 American standards 0 2009-04-29 06:27 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 0 2009-04-26 02:31 PM


所有的时间均为北京时间。 现在的时间是 06:01 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多