默认 what do you call your first revision

what do you call your first revision?
looking for some ideas.. when you all first create a drawing, do you start with a revision (1, or a, for example)? if so, what do you call that revision--what do you put in the revision text? until now we've used "breakdown release" but we're considering changing that, and i'd like to get some alternative ideas. thanks,
brian
i have worked at companies that did it different ways. the most common i've seen was to release a drawing at rev a, using "initial release" as the description. i have also seen drawings released at rev "-" (same description). both methods seemed to work well.
the only problem with that is that we use the term "initial release" as the status of a part/project that has become an order and is preparing to make its way to manufacturing. so, "initial release" is not an option for me. thanks for the quick reply...
numerical revs prior to release, then revision a for initial release.
chris
sr. mechanical designer, cad
solidworks 2005 sp0.1
up until now, we've used a system like that--we're changing to start at 1 and continue through production with the next number. we're using a separate "status" area in the title block to denote a drawing's current status, so we don't need to do it in the revisions any longer.
thanks for the quick reply...
brian
we start all new drawings with "x" revisions, starting with x0 (followed by x1, x2, etc..). when the drawing is offically released we remove the revisions and start with no revisions. all revisions from then follow a, b, c, etc.. except for revisions to bare pc boards. if a drawing is changed but the change does not affect the physical layout or hole sizes on the board then it gets a number instead of a letter, b1, b2 for example.
mcdonnell douglas used rev: "new" for the initial release of a drawing. then they used alpha revisions: a, b, ...z, aa, ab, etc.
x is never allowed per drafting standards.
chris
sr. mechanical designer, cad
solidworks 2005 sp0.1
rev. "new", "nil", "-" or "0" are all common.
i prefer systems that use an "issue" level rather than a "revision" level.
the first time a drawing is released it is at issue 1. make changes and release, issue 2. it's so simple.
ctopher,
you are correct that "x" is never allowed, nor is i, o, s, or q because each letter could look like a 1, 0, 5, or 0 depending on the font used.
but, and i'm going to reference dod-std-100 because i don't have the latest asme equivalent in front of me, for the initial drawing release, there needs not be any information in the revision block, although most places add a rev "new" or "-" or "n/c" for no change there. the first change is denoted with an "a." initial releases should not start with an a.
but, for parts that have not yet been production baselined (and this deals with configuration management and since cmii is out that no longer follows a mil-spec, this is now covered in the current asme specs), a revision of x0 for initial "prototype" released followed by xa, xb, xc, etc. once the part has been baselined for production, the revisoin goes to a "-" and the revision history is maintained in the rev block.
i believe this information is covered in the appendices of asme specs because the are carry overs of the dod- and mil-std. commercial practices may not have this info defined, but it is useful and beneficial.
--scott
swertel i agree with "n/c" or "-". for some reason my company has always released new dwgs with "a". i have never agreed with it, but they will not change it. our customers don't agree with it either, but we still do it.
all preliminary dwgs prior to release are numerical rev's "1,2,3...".
chris
sr. mechanical designer, cad
solidworks 2005 sp0.1
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
revision huangyhg tec-ease(America) 0 2009-09-05 12:40 PM
【转帖】ambiguous call to overload functions in odstring.h yang686526 DirectDWG 0 2009-05-04 03:56 PM
【转帖】what do you call your first revision yang686526 American standards 0 2009-05-04 11:14 AM
【转帖】revision yang686526 American standards 0 2009-04-29 09:45 PM
【转帖】revision table part properties yang686526 SolidWorks二次开发 0 2009-04-13 01:58 PM


所有的时间均为北京时间。 现在的时间是 01:09 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多