几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD/CAM/CMM » SPC质量控制
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-05, 08:53 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 confidence level for microwave detector

confidence level for microwave detector
i have studied some statistics in my electrical engineering and physics classes but not enough to know or cover what "95% confidence level" is and how to apply it.
i need help for the following task:
our traffic department needs to determine the "95% confidence level" of a microwave detector. it will be installed at a city intersection with in-the-street magnetic loops to detect cars approaching or waiting for the traffic light to change. the point is to determine whether or not the microwave detector is reliable enough under conditions of rain, fog, heat, cold, day or night conditions to replace expensive in-the-street loops. the microwave detector will be aimed at a lane that has a loop for its evaluation and the counts of the microwave detector compared to the loop counts. my boss needs to know how many vehicle counts are required to get this "95% confidence." the loop detectors will count all vehicles while the microwave detector may or may not detect all vehicles under all the above conditions.
thank you in advance for any help.
alan
find a job or post a job opening
on it's simplest terms, whether it meets the 95% confidence interval can be merely calculated as the percantage of positive results when compared to the loop detector. if it is above 95% you are ok.
if you get a large number of samples, then statistically, you will be very close to the true result (population). if you have a small sample size you will need to start looking at sample statistics versus population statistics.
of importance though, is when the 5% of scenarios occur. if they are random, then the system should be acceptable, but if they all occur under certain conditions, then the whole system will not function at times. this would be unnacceptable for that type of system.
craig
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
assembly drawing, level 3 huangyhg tec-ease(America) 0 2009-09-04 04:54 PM
【转帖】how to obtain model information 9high level entity0 yang686526 DirectDWG 0 2009-05-06 03:00 PM
【转帖】dod level iii drawings yang686526 American standards 0 2009-04-29 07:37 PM
【转帖】asme - where to star yang686526 American standards 0 2009-04-29 07:28 PM


所有的时间均为北京时间。 现在的时间是 09:31 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多