几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 01:19 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 asce 7-98 drifting

asce 7-98 drifting
drifting is computed using the length of the roof upwind of the drift, lu per figure 7-8, asce 7-98.
if you have a parapet perpendicular to the wind direction which blows the snow off of the upper roof, can the distance to the parapet be used for lu?
find a job or post a job opening
jike- is the parapet on the high or low roof?
i don't think you can take advantage of a parapet on a higher roof to "block" the snow from continuing to migrate off the higher roof.
also, note that you need to also include windward drift (see figure 7-7)
parapet only affects leeward consideration and becomes part of hd. essentially no help from parapet.
samdamon, the parapet is on the high roof.
jae, i am aware of the windward drift requirement.
i would think that the parapet would block some of the drifting potential, but the code does not mention whether this is allowed.
jike- i agree with the other posters that there is no reduction in the drift load on the lower roof if the high roof has a parapet. it might actually hurt because having the parapet means the snow can pile higher on the lower roof. the "hc" dimension in fig 7-8 would need to be measured to the top of the parapet el. rather than just to top of high roof el. regards.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
asce 7-98 allowable stress increase huangyhg 产品功能分析 0 2009-09-07 01:18 PM
asce 7-05, 7-02, 7-98 confusion huangyhg 产品功能分析 0 2009-09-07 01:15 PM
asce 7-05 wind load methods 1 2 huangyhg 产品功能分析 0 2009-09-07 01:14 PM
asce 17-96 para. 4.2.5 load combinations seiasce 7-02 com huangyhg 产品功能分析 0 2009-09-07 12:54 PM
are asce 7-02 wind loads ultimate or service level huangyhg 产品功能分析 0 2009-09-07 12:46 PM


所有的时间均为北京时间。 现在的时间是 05:36 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多