几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 03:03 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 beam splice

beam splice?
how would you design a splice for cold formed/light guage steel c-studs? the studs do not overlap. they want to use stud material on the backside for the splice plate.
moment=12k-in
rafter is 8" csj.
how many screws? screw pattern?


i don't like that idea at all, but the only way i would even consider it is to have a 2' (just for talking purposes) piece set inside the two pieces to be spliced and screw them together. that's the most directt load path i can see.
if these are rafters, you might want to consider something similar to pemb roof construction where cold rolled c's or z's are lapped over the supports and extended past the support until the single
there is no support. the splice location is 4' from a bearing on a 16' span.
adam...
i understand that, but what i am suggesting is to lap the rafters from each side over the support, similar to pemb construction.
there are some other considerations here that you might want to think about:
are the splices to be done "up in the air" or "on the ground"? i suspect "on the ground" and lifted into place since a worker would need to be on a scaffold if he will make the connection "in the air".
if done "on the ground", then you need to consider stresses in the connection from lifting it into place.
sorry, i'm not familiar with penb construction.
pemb = pre-engineered metal building
are you transfering bending and shear through your splce or just shear forces with the one beam cantilevering out the 4' and supporting the 12' span?
i suggest a bent plate in the shape of a channel applied outside of the rafter. a lap of two feet on each
buckling could be a big issue for this, make sure that the
addressing the previous post: i am attempting to transfer bending and shear.
one suggestion was to treat it like an eccentric load on a bolt group. (instantaneous center concept). do you think that is an acceptable theory?
that method would require 10 screws on each side:
2 horizontal rows of 5 screws. row spaced 6" apart. screw spacing = 2" any thoughts?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
beam splice deflection question huangyhg 产品功能分析 0 2009-09-07 03:02 PM
beam design huangyhg 产品功能分析 0 2009-09-07 02:52 PM
beam bracing questions huangyhg 产品功能分析 0 2009-09-07 02:45 PM
beam above another beam - with gap huangyhg 产品功能分析 0 2009-09-07 02:44 PM
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM


所有的时间均为北京时间。 现在的时间是 06:50 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多