默认 cutting rebar in existing slabs

cutting rebar in existing slabs
i am very familiar with aci-318 (and several other aci publications) but have never come across an analysis of the impact of cutting a single piece of reinforcement in an older (+ 50 years) existing slab.
does anyone have an article on this?
thanks.

jjf -
i don't think there'd be any specific article on this - just engineering "common" sense in that if the bar is a primary reinforcement, and you cut it, then adjacent primary bars would have to take the lost tensile load of the cut bar. this would add stress to these bars which may or may not develop some flexural cracking.
you can simply calculate the required area of steel necessary over the wider width to see if you have a problem. aci requires a max. spacing of primary flexural steel of 18" so for bars at 12" o.c., with one cut, you'd exceed the 18" (thus the possible cracks).
jae,
thanks for the response, i was more concerned with judging the impact of this cut with the 50 year old materials.
i agree that a simple one way slab analysis would be a good check, but again, 50 year old concrete/rebar......
if you think of anything else, please let me know.
jjf
well if its old and there is evidence of deterioration throughout the slab, then "depending" on the adjacent rebar may be problematic as the adjacent bars could be partially gone and you end up cutting the only good bar in the vicinity.
engineering judgement required here - inspect the slab - where the hole is to be cut and decide based on the condition. old old concrete is actually stronger (f'c keeps increasing slightly over time) and if the rebar is not rusted, it is still performing and able to perform like new (assuming no fatigue issues).
one other note 50 years ago design was done by allowable stress, not ultimate strength, so to be consistent you may want to evluate the impact of the work by allowable stress
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cutting doors in existing concrete tiltwall panels huangyhg 产品功能分析 0 2009-09-08 04:19 PM
coverplating existing columns huangyhg 产品功能分析 0 2009-09-08 02:16 PM
connecting a new foundation to an existing huangyhg 产品功能分析 0 2009-09-08 01:09 PM
calculating load on rebar to calculate embedmen huangyhg 产品功能分析 0 2009-09-07 10:00 PM
【转帖】rendering On Existing Mfc Device Conte yang686526 DirectDWG 0 2009-05-07 02:57 PM


所有的时间均为北京时间。 现在的时间是 02:42 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多