几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 04:40 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 deep concrete pier - area of rebar required

deep concrete pier - area of rebar required
i'm trying to calculate the area of steel (for rebar) required for a reinforced concrete pier. my shear force is 28 kips, axial loading is 112 kips, and my uplift force is 59 kips. for estimating purposes, my pier is 3' in dia x 28' deep (28.5' oal) with 6" above the ground. soil is sand. i need help calculating the maximum moment on the pier below ground as well as the calculations to determine the area of vertical rebar (dowels) required. thanks
gtower
do you have any geotechnical data available? you need the geotechnical engineer to calculate the point of fixity of your pier. if you have all the necessary soils information you could use a program like l-pile to calculate this yourself. (there are other methods of estimating pof, but this is how i would go about it) once you know the pof you can use that depth as the column length. estimate the steel reinf.( 1% to 8% gross section area from aci, but start with 1%) and run some interaction diagrams (i use pcacol software) to see if your axial load and max moment fall inside the curve.
i strongly recommend you get the l-pile program and a geotech report. are your axial and uplift values shown the actual net numbers. with a 3ft pier and 112 kips axial your soil bearing capacity required on sand is 15.85 ksf assuming no pier side shear resistance from the sand. i suggest you re-think your design with experienced pe's.
thank you both for your comments.
the numbers were hypothetical so i'm sure the pier size was not right. we do have a soil report. the loads included a safety factor. we do not have l-pile or another equivalent software program yet so i'm having to rely on spreadsheet calculations developed by someone else. the spreadsheet i was given has some calculations in it that i can't tell where they are coming from. i am looking for some manual calculations to see if the output makes sense. thanks
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
big concrete pier huangyhg 产品功能分析 0 2009-09-07 03:45 PM


所有的时间均为北京时间。 现在的时间是 09:33 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多