几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 05:07 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 demolition of fire damaged structure

demolition of fire damaged structure
are there any guidelines for demolition a steel frame structure that has been damaged by fire. the second floor girders and columns are sagging/bent and need to be removed. the first floor girders and coulmns are fine. all wood floor beams are damaged and are to be removed.
the client does not know what he will build on the first floor yet. to remove the second floor column, i am thinking ahead and proposing that they cut them off at least four (4) feet from the fist floor level for possible splicing in the future. any thoughts?
thanks,
kxa...that's probably a good idea. you will need to check and make sure that the columns are not damaged. lack of deformation does not necessarily mean no damage when fire is involved.
if the columns were painted and the paint is not blistered, you're probably ok. if blistering of the paint occurred, check hardness in the field to make sure you didn't get quenching when the fire was doused.
if the columns are not painted, i would check the hardness in a vertical traverse to check the consistency.
thanks ron. the structure is about 70 years old with riveted connections and the steel was never painted. in fact, it has a lot of rust that the in some areas they are peeling as much as 1/4" thick. there is steel plenty of steel left i think sandblasting should clean that up. what is the best way to do a hardness test?
you also might check with your building department to confirm/verify that you can construct on the same footprint...
other than corrosion issues, if the steel is that old, there's a good chance that it has not been affected if no visual damage bearing in mind that it was likely designed for fy of maybe 30ksi or less; it is also possible to remove samples and have them tested.
kxa..you can use an equotip portable hardness tester, but you need to be sure that the outer surface that might be carburized is removed by sanding. usually no more than about 50 mils needs to be removed.
ron, your range of knowledge continues to surprise me. good to see you around here a bit more.
jae...thanks. that's very kind of you. i feel very fortunate in my career to have been exposed to lots of different things. it makes me enjoy it every day.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
demolition of 5-story reinforced concrete building huangyhg 产品功能分析 0 2009-09-08 05:07 PM
damaged steel column capacity huangyhg 产品功能分析 0 2009-09-08 04:24 PM
cable structures and fire protection huangyhg 产品功能分析 0 2009-09-07 06:04 PM
42 tall cmu firewall huangyhg 产品功能分析 0 2009-09-07 08:47 AM
ordinate dimensions to define gdt datum structure huangyhg tec-ease(America) 0 2009-09-05 11:59 AM


所有的时间均为北京时间。 现在的时间是 12:57 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多