几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 06:50 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 dimensions on foundation plan

dimensions on foundation plan
i work primarily with residential and smaller commercial projects, so this question may not apply to all. when i create a foundation plan drawing i have typically shown all the dimensions. many times i am just copying from a plan designer's drawing (or taking their cad file and manipulating) so that it has the appropriate structural notes and references. every so often a dimension gets mixed up (or revised without my knowledge) which leads to obvious field issues. i have heard of other folks just leaving dimensions off the foundation plan and basically refer to the architectural plans by others for all dimensions. is this a common practice?

imho, show all dimensions that are possible. if the plans are interpreted with a scale, the change of error goes way up. you are letting others, who do not have your insight into why specific dimensions have been selected, make the decision on what to use.
another reason is that certain copying processes change the size of the copied (paper) drawing. then a direct scaling of the copy will give the wrong answer.
also, if a field error is made that has to be corrected it will be very difficult for you to "prove" that your scaling of the drawings is "better" than someone else's.
putting an note on all drawings that says something like:
"drawings are not to be scaled" is often used on industrial projects.
slow a graphic scale on the drawing.
if you are the person responsible for the design, show dimensions once and show them correctly.
good luck
fss we do alot of similar work. some firms don't put any dimensions on the drawings (which is frustrating for the contractor & can lead to errors when the architect makes changes and no one is sure if the engineers drawings are updated or if they have the updated drawings. this can be a problem also if a beam span is increased or slab span).
the benefit of having no dimensions on structural is that the building will always fit on the foundation.
however in residential, it is generally up to the contractor/owner to review the drawings and flag any dimensional errors prior to constrution. it is also thier responsibilty to notify you of any changes. our firm puts a disclaimer on the drawings to this extent on all residential.
it is unreasonable to think you will be perfect and error free every set of drawings. the more responsibility the contractor assumes, whether it will hold up in court or not, the closer they will check things over as an extra set of eyes. if the contractor thinks something even "might" affect his pocket book, they will check things very closely. this is residential i am referring to mostly.
to date, any errors we have come across the contractors have been very willing to work with us to come up with a solution. hope that helps
based on the drawings provided by the architect, generate a layer of structurally relevant dimensions and show on your foundation plan. in the process of developing this, you may uncover many floating dimensions which need to be coordinated. keep a record of the date of the latest revision date of the arch drawing your work is based.
general notes should say that drawings shall not be scaled and when dimensional conflict exists, contact the architect for resolution prior to proceeding with work.
though many decent architects inform the engineer when they revise major dimensions affecting structural work, some fail to do this. this disconnect is the root of most dimensional issues from the field.
for multi story buildings, at levels above the foundation, i tend to leave out all dimensions already shown on the foundation plan and only indicate ones that are unique to that level.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
crack in foundation wall huangyhg 产品功能分析 0 2009-09-08 02:20 PM
connecting a new foundation to an existing huangyhg 产品功能分析 0 2009-09-08 01:09 PM
bim and dimensions huangyhg 产品功能分析 0 2009-09-07 03:49 PM
ordinate dimensions to define gdt datum structure huangyhg tec-ease(America) 0 2009-09-05 11:59 AM
【转帖】ordinate dimensions to define gdt datum structure yang686526 American standards 0 2009-04-29 09:04 PM


所有的时间均为北京时间。 现在的时间是 12:45 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多