默认 drilled piers

drilled piers
greetings all,
i put a call into my local contractor, but figured since i'm waiting i'd ask. i am looking at a foundation wall, 12" thick and 13' deep. next to this is a 3' dia. drilled pier (or pile) that is 8' deep. the distance from the edge of pier to wall face is 12" +/- 2". taking into account the drilling rig bit and head. it seems to me that this would be difficult to implement. am i correct?
the loads involved with the pier are small, around 7.5kip combined dead and live. the soil against the foundation is back-fill and not in-situ. as always any insight would be greatly appreciated.
check out our whitepaper library.
why so big of diameter for 7.5 kip load, (try 8" diameter pipe pile)? some drill rigs can get very close to obstructions.
you will be within the backfill zone of the wall. i assume this is granular material. can it be drilled in that wiothout a casing?
is there a better solution like building a haunch on the wall? or forming and pouring a pier down to the existing wall footing.

civilperson,
the pier size was necessary to accomodate architectural cladding over the column. it's more for bearing surface than loading.
jike,
how would that affect the existing foundation?
i forgot to ask: i assume that this will put a surcharge load on my wall (which i'd need to check) correct?
i can't answer how it would affect the footing. you will have to evaluate that.
if the pier does not extend to the base of the wall, then you would need to evaluate surcharge on the wall.
thanks for the information. i appreicate it.
i did a job with drilled piers recently right up against an existing building on a property line. the drilled pier contractor i worked with needed one foot clear to work with. looks like you've got your 12" clear. of course, more room is better if you can get it.
if the drilled pier is founded at 8' depth it will bear on backfill and settlement can be expected. also, it will add surcharge to the existing foundation wall if only drilled to 8' depth. if the pier is founded at the same depth as the existing strip footing the settlement and surcharge issues disappear.
if the pier is drilled within 2" of the foundation wall and extends down to the bottom of the strip footing (12'), will it overlap the footing projection?
what about the weeping tile at footing level?
could helical piles be considered with a 3 ft. diameter pile cap?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
drilled piers and load testing huangyhg 产品功能分析 0 2009-09-08 07:46 PM
drilled pier spacing huangyhg 产品功能分析 0 2009-09-08 07:45 PM
cutting trough wall on drilled piers huangyhg 产品功能分析 0 2009-09-08 04:22 PM
circular tie details for drilled piers huangyhg 产品功能分析 0 2009-09-07 11:48 PM
anchor bolts in drilled piers huangyhg 产品功能分析 0 2009-09-07 11:51 AM


所有的时间均为北京时间。 现在的时间是 10:02 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多