默认 early concrete loading

early concrete loading
on our structural general notes page for our typical jobs, we usually put a note that says do not load concrete members before 14 days and before their specified 28 day strength is obtained. i have a contractor asking if he can load it before the 14 days. is there an aci document that i can reference to find a good answer for his request? aci 347? is there general industry practice for this?

probably not, but the earlier you load it the higher the creep deflection will tend to be.
just say no, they tendered for it as is with the notes stating that, if they didnt read the notes then thats their problem.
you can strip formwork earlier not sure about loading. we have loaded ground slabs earlier. but these were lightly loaded. can you carry out quick design check on the proposed loading, advise him of min strength, say he has to do cube tests to prove. that should put him off.
in seven days ordinary conc. should attain it's 75% of specified strength. contractor can load it to some percentage (say 25%) of it's full capacity so that construction can proceed. make sure to give this info in writing and make him responsible for any outcome of "his" deviation from standard procedure. also you should have 7 days test result available from same job.
when you write like this, probably he will like to wait ! ! !
another way to handle the situation is to tell the contractor something like this: "since you want to do something that is not allowed by the specs, you provide the documentation to support your request."
as an owner, we have used this many times solve this type problem. most of the time that is the end of the matter, but every now and then a contractor will come up with a way to do what he wants that is acceptable and benefits the project.
as someone who does a lot of construction engineering, in most cases it is the contractor's engineer who deals with situations like this, unless there are very specific concerns with the proposed situation. i would do as suggested by slideruleera and hand the responsibility back to the contractor.
i get asked this question quite often. my standard reply is that either a high early cement or an accelerator needs to be added to the mix. then a compression test on a three day cylinder should be made. after i have had the opportunity to review the results of the test break then i will decide if it is acceptable to begin loading the concrete.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete roof slab load huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 03:46 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多