几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-08, 10:07 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 elongation for short self stressing bed

elongation for short self stressing bed
i am using formulas for elongation and evrithing is ok for long bad (400ft), but for short bad (50) i am getting the forces above the 80% of the specified minimum ultimeate tensile strength.
any idea what is wrong.
thanks
find a job or post a job opening
when i first read this, i had no idea what you were talking about. now i think it is an issue with some type of precasting arrangement, and you have a problem with tensile stresses on release. but it is hard to advise you when you give us so little information.
you right, i will try to provide more information. see attached document.
i hope the attached file will help to understand what i am tolking about.
thanks
sorry, but that doesn't help me to figure out what your question is. anybody else understand?
etabs2002,
you have added about 2.5% extra force, so if your initial force was within 2.5% of 80% then obviously it will be over. is there a problem with this. after the force losses the final force will be what you started with which is less than 80%.
i do not understand why you are allowing for bed shortening. it happens as the stressing is done doesn't it, so you do not have to overstress to make up for it, same as the dead end slippage.
if a strand is too short, the slippage losses will be detrimental to the stressing in the cable. ex. to stress a short strand you need to pull it an extra inch for every 20 ft of length. if the bed is only 10 feet and you lose 1/2" is slippage due to the terminations, you will not be able to compensate.
a good strategy to deal with this is to have long stressing beds. large precasters have beds that are 200 feet long. even if you are only producing product that is 20 feet long, you can put three pieces in one 60 feet long bed and distribute the slippage losses over the three peices instead of one.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
brick with bed joint reinforcemen huangyhg 产品功能分析 0 2009-09-07 05:00 PM
any pt expert here huangyhg 产品功能分析 0 2009-09-07 12:21 PM
aircraft cable force-elongation huangyhg 产品功能分析 0 2009-09-07 10:24 AM


所有的时间均为北京时间。 现在的时间是 03:58 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多