几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 02:46 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 going rates for commercial designs

going rates for commercial designs?
can anyone tell me what the going rate is in tx for the design of a commercial wood structure with approx. 13000 s.f.? will be using prefab roof truss system.

1. general rule for structural engineers is to charge 1.5% - 2% of the construction cost. i am not sure if your client would be willing to pay that.
2. another method is to do a sheet count and charge $1500 to $2000 per sheet. commercially though, i have seen them as low as $500. frankly, i would not do the drafting for that.
3. you can create a spreadsheet and estimate your hours to do al lt the tasks then assign an hourly rate for the tasks and get your fee that way.
4. do not forget your overhead and reimbursables.
i hope this helps.
they are 3 ways that we use to estimate design costs:
no. of sheets x cost per sheet
sum of hours for each engineering task x hourly rate plus drafting
traditional percentage of construction cost
add in additional costs for meetings, shop drawings, field observation and problem resolution.
i would think for the project described the cost would be closer to 1%. this will vary quite a bit depending upon the particular architect or contractor, the amount of services desired, seismic or no seismic, building construction type, complexities, building plan review process, east coast or west coast, etc.
don't forget the time required to check shop drawings-
we assume there will be about 350 shop drawing sheets for each 100,000 sf of framed floor. a checker might be able to get through 8 sheets a day. you get the idea.
samdamon:
i am intrigued with your 350 shop drawings for 100,000 sf estimate! is this a rule of thumb for metal trusses only or does it cover the number of structural shop drawings that can be expected on a typical project?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
foundation designs for telecommunication towers huangyhg 产品功能分析 0 2009-09-09 01:29 PM
concrete mix designs huangyhg 产品功能分析 0 2009-09-08 12:18 PM
concrete c uring rates huangyhg 产品功能分析 0 2009-09-08 11:46 AM
any standards for designs using live trees huangyhg 产品功能分析 0 2009-09-07 12:23 PM
mixed metric designs huangyhg tec-ease(America) 0 2009-09-05 11:44 AM


所有的时间均为北京时间。 现在的时间是 02:35 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多