几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-09, 06:47 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 ibc collector design

ibc collector design
i have a 2 story building that has eccentrically braced frames through entire length at each story. the frames are stacked. this is seismic category c. i will design the collectors at the roof for the special combinations of 1605.4.
i'm not sure what to do for the second floor collectors. the roof forces will be going directly into the 2nd flr frames from the columns, plus the collectors have to be designed for the 2nd floor seismic force too. but how should this total horiz. load to the 2nd flr collectors be combined (qe)?
1) omega x[roof minimum + floor minimum diaph force]
minimum meaning comparing eq.16-41 to eq.16-64 for each
level, using the one that controls in each case.
2) omega x[floor minimum diaphragm force (16-41 or 16-64)
+ the roof level force from 16-41].
3) omega x[floor minimum diaphragm force only] + roof force
from 16-41
i discussed this with someone else i work with. i think that as a diaphragm part, the 2nd floor collector horiz force should be checked for h=(f2 or fpmin)x omega. as a frame
on second thought, or third, i think where i have gone wrong in this whole thing is with the definition of a collector. even though each frame beam will collect the diaphragm force tributary to it's frame, i don't think it is really a "collector" or what the code has in mind for a collector or drag strut. since the frames are continuous from one end of the bldg to the other, no real "collectors" are present on the roof or floor. anyone disagree?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
ibc 2107.2.3 vs. aci 530 2.1.8.6.1.1 masonry lap length cage huangyhg 产品功能分析 0 2009-09-09 06:46 PM
ibc osha stairs huangyhg 产品功能分析 0 2009-09-09 06:35 PM
base shear calculation fron ibc and asce-7 huangyhg 产品功能分析 0 2009-09-07 02:29 PM
bar splices in cmu for ibc are too much huangyhg 产品功能分析 0 2009-09-07 02:19 PM
2003 ibc seismic - troubleshooting huangyhg 产品功能分析 0 2009-09-07 08:27 AM


所有的时间均为北京时间。 现在的时间是 04:54 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多