几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-10, 03:24 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 mud jacking specification

mud jacking specification
hi.
i posted this on the concrete engineering forum, but haven't received a response yet. i was hoping someone here would be able to assist me.
i have a project where a homeowner had some cracking and settlement in his basement floor slab.
after coring through the slab we found voids ranging from 1/16" to 1/2". the slab is underlain by a pea stone below-slab drainage system.
we would like to grout the voids and raise the slab slightly in a couple of areas where it settled.
my fear is that if the grout is too thin it will infiltrate the voids in the pea stone and render his below-slab drainage system useless or at least reduce its capabilities.
has anyone had experience with this type of problem? if so, how do we test the grout to ensure it is thick enough? is there a maximum slump or a flow cone value that would be appropriate?
thanks is advance!
check out our whitepaper library.
first you need to address why there are voids in first place. hate to see you go through expense of filling voids and other repairs only to find that additional weight causes more settlement, and thus more voids.
i believe there is a combination of poor compaction of the underlying sand and curling of the slab that have created the voids. i believe most of the settlement is complete. we augered the soil under the slab and compared that to the geotechnical report. we did not encounter organic soils.
i believe that after grouting the slab should be supported. i just don't want to hinder the below-slab drainage system by clogging the pea stone.
hi eric1037
please note that the slab serves as a bond break between wet soil and a dry concrete floor. the gravel prevents water from wicking throgh to the concrete floor. the voids in the gravel prohibit capiliary action (wicking) from continuing into the concrete slab. the point is, if you fill the pores in the gravel with grout or if you reduce the pore size in the gravel you may end up with a damp concrete floor becaus ethe water will wick through the gravel and into the concrete.
maybe the slab is still settling? in which case the grout won't help because in 3 years the slab will settle again.
if the house is new, there may be a poor soil condition below the slab. possibly the contractor backfilled and never compacted and now the soil is settling.
if the house is 20 years old, the settlement has propbably tapered off in which case you may proceed with remedial work.
be careful about filling voids in gravel or you'll end up with a damp floor and maybe a mould problem.
how about setting up your own test? obtain some of the pea gravel, place in a trench, cover with concrete and try injecting grout with different mixes. then inspect for fouling of the gravel.
if you have a drainage system under the slab. it will almost certainly clog with any type of grout .the only way to do this work is to abandon the below slab drainage
and create an alternative ring drain system to intercept any water before it gets under the slab.
instead of grouting and possibly ruining the gravel and draingage system, how about removing the old slab, placing a vapor barrier, and pouring a new slab?
fortunately, after further exploration, we discovered that the voids were not pervasive across the entire slab.
therefore, i believe localized grouting shouldn't significantly compromise the below-slab drainage system since it is a relatively small area. this assums the grout does not enter that actual drains themselves.
thanks for all of your responses!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
specification practices huangyhg tec-ease(America) 0 2009-09-05 12:58 PM
【转帖】problem with handles specification yang686526 DirectDWG 0 2009-05-06 11:19 PM
【转帖】specification practices yang686526 American standards 0 2009-04-29 10:01 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 03:01 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多