pier design
i am trying to design a small pier (4' x 6') to support a fish ladder in a river. we have already designed the pier itself. we cant figure out the foundation. the tough part is the dam the fish ladder is connected to is under a bridge. also, under the bottom of there pier will be solid rock. there is no soil at all. we are not sure how to form the foundation of the pier. the water is relatively shallow, <10', and flows are not too high. there is no head room for a cofferdam because of low bridge clearance.
any ideas?
you probably want to use precast concrete structure than you lower into the water. make this structure higher than the top of the water. then build the pier above the water embeded into the heavy foundation. you can either make it with solid concrete, or hollow conrete filled with rocks.
never, but never question engineer's judgement
i assume the pier is to be placed under water. here are some thoughts:
1. select the location with relatively flat rock surface to place the pier.
2. sizing the footing pad dimension, and forming underwater.
3. place steel casing, just above the water and a distance above the bed rock, and place the concrete.
if sliding is a concern, you can key the footing into the rock by excavation, or install epoxy drill in dowells to fasten it.
an experienced under water construction contractor is essential in this case. also, the season/timing of construction is quite important, to which affects water deepth and velocity of flow, if you have control over it.
use precast manhole sections as stay in place forms for placing concrete in the center of the sections. first excavate down to the stable soil elevation you wish to bear on, place first section with cmu blocks at base to support the section 8" above the soil, place concrete into the center of the mh section with tremie or pump by keeping the end of the tremie 2' below the concrete level. fill slowly, less than two vertical feet per hour and use accelerators in the mix design and low slump. use as many vertical sections as needed to until above the water level. discard the top 6" of concrete which will be diluted by the water.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
in a design and built contract,i ha huangyhg 产品功能分析 0 2009-09-09 07:16 PM
dots requiring pe stamps on shop drawings huangyhg 产品功能分析 0 2009-09-08 07:18 PM
design build huangyhg 产品功能分析 0 2009-09-08 05:13 PM
calculations personal tool or public record huangyhg 产品功能分析 0 2009-09-07 10:10 PM
【转帖】decimal dimensioningfractional equivalents yang686526 American standards 0 2009-04-29 07:28 PM


所有的时间均为北京时间。 现在的时间是 09:12 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多