几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 03:16 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 pt foundation questions

pt foundation questions
i am considering completing the construction of a residential building on a a new abandoned project foundation. this is a pt foundation atop drilled piers. the plans do not indicate either the presence of or requirement for void boxes (carton forms) and there is no mention in the engineer's notes regarding geotechnical test reports in an area of know expansive soils. would these two issues not be addressed as standard engineering practice in writing in the original plans?
thanks.
the presence of void forms below the foundation would indicate high swell potential for the on site soils. this information should be addressed in the geotech report that the engineer of record used for the slab design. see if you can get a copy of the geotech report from the engineer, or see if the geotech report number and contact is listed in the general notes and contact the geotech directly.
i'm curious how you will design the super structure for an existing foundation if you don't know what the allowable pier loads are that it was designed for.
as.
i have the original plans. the engineer's notes are so minimal as to be nearly meaningless. there is no mention of void boxes and there is nothing in the notes, plans, or the engineer's letter regarding geotechnical testing or reports.
my original question was whether or not this information is included in the foundation plans as a general engineering practice. all other plans i have seen within the past 30 years have had the information included.
typically i show the void-forms generically in the foundation details and call them out per geotech, and on the foundation plan i will call out something like "blah blah slab on x" voidforms per the geotech". then we will list the geotechnical report information in the general notes. sorry if this doesn't help. maybe contact the architect/owner and ask them for the geotechnical report. if one wasn't conducted, then i wouldn't do any design until i received one.

thanks austinsturctural!
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
foundation cracking and settling huangyhg 产品功能分析 0 2009-09-09 01:24 PM
crack in foundation wall huangyhg 产品功能分析 0 2009-09-08 02:20 PM
【转帖】求助顾老师修改下面按给定任意长度打断图元的。lsp yang686526 数据库ObjectDBX 0 2009-04-28 03:05 PM
求助顾老师修改下面按给定任意长度打断图元的。lsp yang686526 ObjectARX(AutoLISP) 0 2009-04-27 10:12 AM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 08:25 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多