几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


 
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 03:30 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 punched holes in structural steel

punched holes in structural steel
hi all.
i am engaged in the design of overhead conveyors in a major car assembly plant. i also design the supporting structural steel for theses conveyors. structural engineers don't be alarmed that a mechanical guy is doing this...all the support design goes to a local structural engineer for review and certification. as welding to the building steel is prohibited,we use a wt6 and l 4 x 3 x 3/8" clips to attach to the owsj. the wt6 being on the u/s of the joist (back to back angle bottom chord) and the angle clips over the angles. the wt's and l clips (vertial leg cut to suit)are bolted together clamping on to the bottom chord of the joist. my question is: is there any difference in drilling or punching the holes in the wt's and angles. i've been told by one engineer that punching the holes can cause problems later with cracks propogating from the holes. is this possible?
thanks in advance for any opinions.
driling is preferred for critical
if i would have such concern i would punch the angles, dimensioned if necessary bigger than necessary. this way both the serviceability and safety of the structure as a whole and the reusability of the costlier main
hi
i'm a little new to this structural game but i have been involved with fabrication for years.
the sections you are using are mild steel, pretty ductile stuff. catepillar and other truck fabricators use high strength steels (i don't know the type) for their truck frames.
punching tears the metal and leaves little micro-cracks in the surrounding material of the bolt hole. that's why sub-punching and reaming is done. aisc considers these micro-cracks in their calculations for tear-through and block shear rupture. check aisc lrfd for better and exact information. we use as-punched holes in most connections. we ream sub-punched for critical holes such as cantilever connections for sports stadiums holding thousands of people over the heads of thousands of other people, or when the engineers impose the requirement on us. the same is done for fracture critical
drilling will yield a much better and cleaner hole with no micro cracks. however, it is very expensive and time consuming compared to punching.
i my 23 years of experience in the structural design and mainly steel, i would say that majority of the steel fabricators in the us punch the holes. they punch them 1/16 inch larger than the bolt to facilitate installation. if you have concern with fatigue and stress concentration due to particular joint geometry, drilling may be the way to go.
if the structure you are using will utilize standard steel rolled shapes and you want a steel fabricator to do the work, expect that you will have punched holes. if you specify and insist on drilled holes, expect to pay premium and lengthy fabrication period.
good luck
thanks to all who answered.
i take it punching the holes is not a critical issue and if one engineer refuses to certify the connections,i should consult another.
aisc (asd) permits punching holes (m2.5) within thickness limitations. the specification for structural joints using a325/a490 bolts 3.(c) also permits punched holes.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
 


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pe structural i or civil huangyhg 产品功能分析 0 2009-09-15 11:54 AM
how to handle see structural drawings huangyhg 产品功能分析 0 2009-09-09 05:48 PM
heat straightening of steel beams huangyhg 产品功能分析 0 2009-09-09 04:00 PM
dimensions on structural drawings huangyhg 产品功能分析 0 2009-09-08 06:51 PM
connection of structural steel with stainless steel huangyhg 产品功能分析 0 2009-09-08 01:15 PM


所有的时间均为北京时间。 现在的时间是 08:59 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多