默认 roof pondingdrainage

roof ponding/drainage
in reviewing a roof plan with a relatively flat roof (typical office building structure) the roof slope is created by lowering the columns at interior bays. this results in about an 8" fall from the exterior wall.
however, there is only one drain shown at each location, and no overflow drain. therefore, it seems this is very likely to have ponding problems, since the only overflow drain is a scupper on the exterior wall.
if a secondary drain was installed next to the primary drain, would this suffice to eliminate the ponding problems? the code says to assume the primary drain is blocked, however, i dont see any items regarding placement of the secodary drain. my thought was to install the secondary drain about 2" higher than the other, therefore, only needing me to check for 2" + localized pond, instead of an 8" pond + resulting beam deflections. any thoughts?

you are on the right track with overflow drains. this is what we typically did.
the height of the water that can build up obviously needs to be less than the ll capacity of the roof.
strguy11...not sure where you are, but most codes require that overflow scuppers be not less than 2 inches above the drain outlet nor more than 4 inches above the outlet. you condition does not meet that requirement.
it is not a good idea to use parapet overflows for centrally located internal drains. i've seen roof collapses related to such design. provide an overflow for each drain location, separately piped to the outside. the depth of ponding prior to overflow should obviously exert less load than the live load capacity of the structure, as jike noted.
also do what you can to prevent blockage of the interior drains (if you must go this way). use domed "beehive" grates if you can to prevent floatable debris from covering the drain.
i’m not sure where it is listed (i believe it’s in the international plumbing code) but overflow drains are required to drain to daylight and should not be attached to the pipes of the primary drains.
change the slope direction of the roof to use gravity to carry water to the exterior or build sufficient strength in the roof members for full depth, (to scuppers), ponding. any drains, primary or secondary, can be blocked by the same cause, i.e. ice, wind blown debris, leaves, etc.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
roof drain restrictors huangyhg 产品功能分析 0 2009-09-15 07:22 PM
perpendicular roof wind pressures huangyhg 产品功能分析 0 2009-09-15 12:13 PM
low slope roof construction huangyhg 产品功能分析 0 2009-09-10 11:50 AM
flat roof repairs huangyhg 产品功能分析 0 2009-09-09 12:23 PM
asce figure 6-10 wind loads huangyhg 产品功能分析 0 2009-09-07 01:22 PM


所有的时间均为北京时间。 现在的时间是 12:29 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多