几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-15, 07:33 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 rope stretchpulley calculations

rope stretch/pulley calculations
i have a pulley constrained by a single rope fixed at each end to beams in the ceiling. the beams are at different heights giving different "rope" lengths. if i apply a large load to the pulley, how do i calculate the rope loads? do i take the stiffnesses in parrallel, like two separate springs, or in series, like two springs joined end to end. does the pulley rotate? if it does, the rope extensions are different. if it does not rotate, the extensions are equal. the two approaches give different results and unfortunately one gives a load greater than my minimum break load. which is right???
it sounds statically determinant to me so i don't think the stiffness of the ropes is important. you should be able to solve this based on the geometry of the pulley and the two supports.
the pulley will rotate and move to a point of equilibrium where the angle on each side of the pulley is the same, and the tension throughout the rope it the same. note that the working loads of wire rope for example (you just said rope) is on the order of 6 or 7 to 1, but i'm not sure. you shouldn't be even close to the breaking strength.
if you're not absolutely sure about this get the advice of another engineer, preferably onsite, who can take a look at what you are trying to do. check working loads and factors of safety of all components you intend to use, and don't forget to check the beams in the ceiling for the additional loads.
-mike
you can also get additional information from crosby. they have manuals which also go through reeving design. if its a static system then you can solve it using simple statics so if you can't re
something not mentioned above is whether the load below moves when the pulley does. the response above is based on the applied load always being vertical. if the applied load is through a particular point, it would get a bit more complicated.
as a check, if you'll add up all the vector loads on the pulley when you're done, you should get zero in the horizontal direction and zero in the vertical direction. if you don't, something's wrong.
hi irinfletcher,
if i visualize your system correctly, there was a child's toy made somewhat similar back in the day. it was a deep grooved wooden wheel that rolled on a string suspended between the ends of two sticks, one for each hand. the sticks were manipulated up and down to give the wheel considerable velocity and travel along the string. at speed, the wheel had considerable gyroscopic stability and could be made to do some interesting tricks.

you can make up a physical model of your system to verify that:
1. the pulley does turn and move to an equilibrium point between beam-to-rope attachment points where:
2. the rope tension is roughly the same throughout;
3. the departure angle from vertical of the rope from the pulley is the same on both sides;
4. the tension in the rope is a tangent function of the departure angle, ie. will approach infinity for large angles approaching 90 deg.;
5. for the special case where the departure angle is zero, the rope tension is 1/2 the suspended load;
5. assumptions are that the suspended load is free to translate horizontally and vertically as jstephen stated, and that the rope has sufficient slack so that the pulley is below both attachments at equilibrium and that the pulley functions as normal.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
required calculations huangyhg 产品功能分析 0 2009-09-15 06:05 PM
how often do your calculations get checked huangyhg 产品功能分析 0 2009-09-09 05:34 PM
elongation of wire rope huangyhg 产品功能分析 0 2009-09-08 10:07 PM
creep in bridge rope huangyhg 产品功能分析 0 2009-09-08 03:53 PM
calculations personal tool or public record huangyhg 产品功能分析 0 2009-09-07 10:10 PM


所有的时间均为北京时间。 现在的时间是 03:28 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多