默认 sea water intake basin

sea water intake basin
hi,
i am working on this 40m x 20m x 15m deep concrete seawater intake structure in south america. being new to this kind of structures,i need some suggestion on the temporary work requirement. one of the contractors has suggesten in his quotation that since sheet pile is not that common in this region, they would like to use slurry wall...!! now what exactly is this. apart from this what can be done for water tightness of this structure..external water proofing on walls & slabs including inter epoxy lining or coating the reinf bars itself will do...or changind the concret itself to resist chloride n suphate...
would appreciate if someone can give info on this.
shbh, you will have better luck on this
or
there are a few ways of constructing slurry walls, but in general they involve the following steps:
1. excavate trench, filling with bentonite slurry (thence the name) as the soil is removed. the bentonite serves to support the sides of the excavation temporarily.
2. on completion of excavation, it is frequently necessary to replace contaminated bentonite with new mud placed by tremie, which displaces the first batch, which is then recycled.
3. place reinforcement into bentonite.
4. place concrete by tremie, displacing the bentonite.
then, for your permanent work:
1. excavate inside the slurry walls, providing tiebacks as required similar to sheet pile tiebacks (or some other form of bracing system).
2. dewater as required.
3. construct working slab.
4. install waterproofing (or tanking, as it is called in some areas).
5. construct base slab and walls, using plenty of cement in concrete and plenty of reinforcement.
the contractor who has "suggested" slurry wall in his quotation should be requested to explain his procedures. construction of slurry walls is done by specialist piling contractors.
thanks all of you...
was a good link and construction steps given are really useful to understand the kind of work involved.
but about the waterproofing is it worthwhile to galvanise rebars....or tanking(on outside) and surface coating(on inside) on walls with limiting crack width design is sufficient enough.
in my opinion, galvanizing the reinforcing steel is definitely worthwhile. don't know about the surface coating on the inside if this is a waterproof coating, as generally the rule is that you don't waterproof both sides. one side will fail, and it won't be the back side which can't go anywhere. you may also may want to consider a cathodic protection system, but i can't give any advice in that regard.
is this intake for a desalination plant?
no, it is for a lng plant....water will be used to convert lng into ng.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
retaining wall retaining water huangyhg 产品功能分析 0 2009-09-15 06:41 PM
protective coating for concrete in sea water aeration basin huangyhg 产品功能分析 0 2009-09-15 03:08 PM
parking garage slab uplift from water table huangyhg 产品功能分析 0 2009-09-15 11:28 AM
ground water and foundation huangyhg 产品功能分析 0 2009-09-09 03:14 PM
excessive bleed water in concrete huangyhg 产品功能分析 0 2009-09-09 08:49 AM


所有的时间均为北京时间。 现在的时间是 02:42 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多