默认 seismic connection to pile cap

seismic connection to pile cap
i am planning to utilize precast concrete piles for a foundation in seismic design category c and ibc 1807.2.23.1.1 requires concrete piles to be connected to the pile cap by embedding the pile reinforcement or field placed dowels anchored in the pile cap for a distance equal to the development length.
field placing dowels make sense if it was a concrete filled pipe pile but a little labor intensive to drill and epoxy hundreds of precast concrete piles.
can anyone offer their experiences in making this connection with a precast prestressed pile without using longer piles and breaking up pile to expose tendons?
find a job or post a job opening
detail the top of pile with embedded rebar connectors such as lenton?
jae thanks for the suggestion, but i don't think that will work. after piles are driven to capacity, pile tops have to be cut off to proper elevation.
if the cut-off length is reasonably short, have the pile cast with deep preformed holes, an adaptation for your situation of this florida dot pile splice detail (see "typical splice before bonding")
any pile in spc c, should be embedded at least 18" and thus should have ample room for connection hardware/rebar.
i didn't get this from a code, just experience.
regards,
qshake
eng-tips forums:real solutions for real problems really quick.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
prestressed concrete pile to cap connection huangyhg 产品功能分析 0 2009-09-15 02:41 PM
precast pile connection to pile cap huangyhg 产品功能分析 0 2009-09-15 02:22 PM
pile to pile cap connection huangyhg 产品功能分析 0 2009-09-15 12:29 PM
pile cap included in seismic weigh huangyhg 产品功能分析 0 2009-09-15 12:20 PM
h pile to pile cap connection huangyhg 产品功能分析 0 2009-09-09 03:38 PM


所有的时间均为北京时间。 现在的时间是 11:17 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多