默认 slab pour sequence

slab pour sequence
i have a 3 span horizonlly curve bridge designed by using mdx. i have to provide a slab pour sequence information ,so what is the methodology to do that? i totally have no idea.
thank you for your help
check out the particular state dot where you are performing the work. they often have a series of sequences available for use by designers.
note that just because one is specified, the contractor is often allowed to place the deck end to end if the bridge is sufficiently small enough. i've never had a problem with a three span bridge.
aun:
if i understand correctly, you have your beams ready and what is missing is the pouring of the slab.
two points: the main reinforcement of the slab is radial (or perpendicular to traffic), and in the two central supports, fixed or not to the columns, there must be some negative longitudinal reinforcement distributed in the slab.
avoid suspending the pouring of the concrete -which is radial- in the points of maximum moment or shear.
so, let us say that such negative reinforcement has a length .22l each side of the supports and that the spans are l1, l2 and l3.
you could follow the sequence: pour the concrete from .8l1 to the beginning of l1. go from the other side and pour the concrete from .8l1 to the end of l3.
if there is problem, for example due to weather , in this second stage, you could go from .8l1 to .2l2 and then , from there to .8l2 and afterwards to .2l3 and finally to the end of l3 ( i hope it is not confusing).
with these alternatives, it is possible to have two teams of workers going in opposite directions.
if you want, you also can go in one sense only, following similar steps.
the constructor will not have much problem in jointing the old to the new concrete, because it is easy to give roughness to the old concrete and besides, additional to the negative reinforcement, there are distributional longitudinal reinforcement at the top and bottom of the slab鈥?but if doubts persist, use additives.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
slab on grade problem huangyhg 产品功能分析 0 2009-09-15 11:24 PM
residential slab footing - two pour huangyhg 产品功能分析 0 2009-09-15 06:18 PM
post-tensioned beams parallel to slab huangyhg 产品功能分析 0 2009-09-15 01:51 PM
how to thicken an existing concrete slab on grade huangyhg 产品功能分析 0 2009-09-09 05:54 PM
crack in old floor slab huangyhg 产品功能分析 0 2009-09-08 02:20 PM


所有的时间均为北京时间。 现在的时间是 11:45 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多