几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 11:02 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 structural concrete freeze damage

structural concrete freeze damage
a contractor has built several structural foundations. they were built and cured according to project and aci specifications. these foundations contain block-outs and embedded metals (i.e. anchor bolts with and without sleeves or cans). the contractor was given a completion date and was to be done in the fall. he finished and the structures sat idle until the subsequent contractor was to take the area over. since the completion date, it has rained, snowed, froze, and thawed while these foundations were exposed to the elements. water/ice sat in the block-outs and in the cans and now there is thermal/freeze damage to the concrete, especially between the embeds. the engineer is saying that this is a warranty issue while the contractor disagrees since he met the completion date and was out of the area.
has anyone ever dealt with this situation before? which party is correct? what documentation is out there to prove this?
thank you for your input.
this type of situation is a common problem. the best documentation is the contract itself. imho, if the contract is mute on "protection of the finished (and accepted) work", then the contractor is off the hook. since the engineer is having to rely on calling the problem "a warranty issue" (instead of pointing to specific contract language), it sound like the contract is flawed and the damage is not the contractor's responsibility.
i agree with sre. unless the contract required the foundation installer to protect the blockouts, he is not responsible.
it depends on who is actually responsible for the project oversight. is it a gc (general contractor) project? a cm (construction mgt) project. that is ultimately where the responsibility will lie, who is in control of the project?
good point.
as noted...it's likely a contractual issue. fundamentally, it likely has not significantly affected the performance of the concrete.
ron could be right that no significant damage has been done, but then again he could be wrong. if i were the owner, i would want to be sure. ice occupies 4% more volume than liquid water, so expansive pressures are large.
hokie...you're right, i could be wrong! generally though, one would expect that in that climate, the concrete would be air entrained. given that, any damage would be either superficial or blatantly obvious.
i quick visual inspection would detect the obvious. if you wanted to check for microcracking, a core could be taken and petrography done on it to check for such damage.
i thought the op's statement that there was damage meant that there were visual cracks caused by the expansive force of water splitting the concrete.
hokie66,
yes, there are visual cracks in the concrete. the cracks seem to extend between the bolt cans which leads me to believe that ice in the cans expanded and caused the cracking. the biggest question is: is the contractor responsible for this fix? as previously stated, the contractor had completed the foundation and the area has been turned over to the subsequent contractor. it seems to me that the damage was out of the contractor's control, and this cannot be blamed on workmanship.
by the way, the air content was around 6%.
if there was an official turnover from one contractor to another, surely the first contractor is not responsible. whether or not the second contractor assumed liability for protecting the footings probably depends on his contract.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
pe structural i or civil huangyhg 产品功能分析 0 2009-09-15 11:54 AM
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM


所有的时间均为北京时间。 现在的时间是 03:16 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多