welding to embedments in concrete.
we are designing a steel walkway to attach to the side of a concrete tank wall. to attach the walkway, we are embedding plates in the concrete wall. supports for the walkway will be welded to the embedded plates. the embedded plates are 1/2" thick. we are welding the flanges (thickness = 0.26") of a w6x15 to the plates.
the contractor raised concerns about welding the supports to the embedded plates. he is concerned the welding will create too much heat and pop out or weaken the concrete. does anyone know of any sources that address welding embedments on concrete? does anyone have "rules-of-thumb" or sources of information on limits for heating concrete or welding steel attached to concrete?
the embedded plates are standard for precast connections. maximum weld is six inches of 5/16" filet weld at one time. wait till the temperature is ambient to add additional weld.
where do i find the reference that you refer to about welding attachments to precast concrete?
what does the contractor think embedment plates are for?
as far as what civilperson says, a good welder will do this anyway.
aisc seminar on field fixes said too much heat can cause spalling. their recommendation is to provide thick plates (1/2" minimum for deck bearing, 3/4" for beam bearing). i have managed to stay out of trouble by using 3/4" for embed plates at beam bearing conditions.
this becomes a much bigger problem when you are welding to stainless steel plates embedded in concrete. ss has a much higher coeff of expansion than regular plate steel. we have wrapped the edges of ss embed plates with 1/8" to 1/4" thick foam rod, which then allows the edges of the plate to expand into the foam.
other suggestions - use the smallest size fillet as possible and only use as much welding as req'd for a safe design. if a 0.25" fillet works, don't bump it up to 3/8" and then the guy in the field bumps it up to one size larger becasue it feels good. this is not economical either.
finally, the welders should be using welding procedures to minimize the build up of heat in the joints.
ps - since you are welding the flanges to the plates - are you considering this a moment connection? make sure you have anchors that can yield at the same level as the flanges, so the forces are put directly into the anchors if possible.
a typical note i have used in the past is to allow the concrete to cure at least 72 hours before welding and for the welder/gc to take precautions to avoid build-up of heat in the concrete. pretty generic, not much information.
i would be interested in seeing a document or reference for this as well as the op.
a decent reference for this subject can be found in the pci design handbook...."decent" = they at least acknowledge the problem and provide some recommendations.
i have a similar situation vincentpa, only i have a concrete beam 1'-6" deep and 1'-0" wide with a 6" wide by 1/2" plate is embedded along the whole span of the beam. what i want to do is weld a w8x21 or possibly w6x15 column to the embedded plate.
i don't have access to a pci design handbook, does anyone have any other good referances or articles that discuss welding on plates embedded in concrete.
from the posts above (other that blake989's) i'm not sure where i can find any more information on this topic.
any help would be appreciated.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete corrosion in partial saturated condition huangyhg 产品功能分析 0 2009-09-08 11:54 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
【转帖】asme美国机械工程师标准目录2 huangyhg American standards 5 2009-04-26 02:38 PM


所有的时间均为北京时间。 现在的时间是 09:15 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多