几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-16, 11:37 PM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 wtc, again

wtc, again
while watching the latest nova program concerning the whys and wherefore of the wtc collapse an interesting point came from one of the investigators/narrator. it concerns the failure mode of the bolts holding the floor joists to the beams. the description was going along very well as he explained the fire with resultant sagging of the floor joist. when he was describing the connection failure that caused the progressive collapse he noted the bolts were supposed to fail in shear. he then said that due to the sagging joist the bolts failed in tension. if i heard him right he then said this was the weakest direction. i think the weakest direction was a slip.
can anyone explain how the bolt at the joist to beam connection could ever be in tension? even with the joist on the floor below the clip would also be bending and the bolt would still be in shear.
thanks,
here is an interesting site on the wtc.
i got the same impression that you did when i first heard mr. charles thornton make that statement. fortunately i have the progarm on tape and listened to that part again. he says that the heat of the fire caused the floor trusses to sag and "begin acting like a catenary". this of course would mean that the floor trusses are now actively "pulling" on there connections (instead of primarily "bearing" on them). the bolts at the connections were oriented so that this "tension" from the sagging floor trusses caused the bolts to shear.
slideruleera,
thanks.
i missed the statement about the catenary. that was one hell of a good bracket on the beam. it done its job to the last as it was designed to do. i don’t think their animation displayed this scenario to well or did i miss this as well.
still have my k&e log log duplex decitrig and a set of log tables along with ibm punch cards.
also numerous types of k & e graph paper. also a 4 function 2 digit calculator (not operating) that i paid $125 usd in the 60s’and was the envy of the engineering group.
unclesyd - the discovery channel & history channel both had specials on the wtc, but the nova program seemed the best (from and engineering viewpoint).
i still have my pickett n4-es log log dual-base speed rule and still use it occasionally (for practice). remember friends who had your k&e model - a very good rule. my first electronic caluculator was a texas instrument sr-10 (sr stood for "slide rule"). would not do much more that the basic four functions however. sometimes would work parts of a certain problem on the pickett (trig, logs, etc.) and other parts on the ti (add, subtract, etc.).
best wishes
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
wtc fire resistance tes huangyhg 产品功能分析 0 2009-09-16 11:37 PM
wtc fema repor huangyhg 产品功能分析 0 2009-09-16 11:36 PM
world trade center original drawings huangyhg 产品功能分析 0 2009-09-16 11:32 PM
why the wtc towers fell - on pbs huangyhg 产品功能分析 0 2009-09-16 09:17 PM
enr article on nists wtc 7 repor huangyhg 产品功能分析 0 2009-09-08 10:34 PM


所有的时间均为北京时间。 现在的时间是 10:04 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多