几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量  


返回   几何尺寸与公差论坛------致力于产品几何量公差标准GD&T (GDT:ASME)|New GPS(ISO)研究/CAD设计/CAM加工/CMM测量 » 三维空间:产品设计或CAX软件使用 » CAD设计 » 产品功能分析
用户名
密码
注册 帮助 会员 日历 银行 搜索 今日新帖 标记论坛为已读


回复
 
主题工具 搜索本主题 显示模式
旧 2009-09-07, 10:20 AM   #1
huangyhg
超级版主
 
huangyhg的头像
 
注册日期: 04-03
帖子: 18592
精华: 36
现金: 249466 标准币
资产: 1080358888 标准币
huangyhg 向着好的方向发展
默认 advice on tearing off 2nd floor roof trusses cleanly

advice on tearing off 2nd floor roof trusses cleanly?...
any advice on tearing off 2nd floor roof trusses cleanly...
i used to work for a hospital and am trying to remove a roof and add a second floor to it. please direct me to any sites you know of that coordinate roof removal.
i am thinking of taking off everything except the bottom two feet of the existing trusses...since we are adding back steel trusses, we can keep everything already tied together and keep the existing plaster ceilings.
i am hopeful that we can get a crane and a bunch of guys who are clean and fast workers...advice requested.
check out our whitepaper library.
when you remove the existing roof - you may create an instability in the structure. most all structures depend upon the stiffness of the roof deck diaphragm to transfer lateral forces across the building and into the foundation.
if you remove all of the roof at one time, you probably should provide lots of temporary bracing to ensure that the remaining structure is stable.
also, since you are adding a second floor (and presumably a new roof level) you should definitely verify that the existing walls/columns/footings can accept the additional loading safely. if you don't know how do check/design or verify these things, you should hire a competent structural engineer.
as jae pointed out there are many considerations that need to be analyzed before deciding whether this construction approach is even feasible.
i doubt whether the remaining bottom chord will have enough strength or stiffness by itself to support the plaster ceiling without additional supports or strengthening.
much more information is needed for one to completely understand the challenges of this project. you really do need to hire a local structural engineer, at this stage, to analyze the feasibility of your proposal.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
advice for horizontal reactions on trusses huangyhg 产品功能分析 0 2009-09-07 10:20 AM


所有的时间均为北京时间。 现在的时间是 08:04 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多