默认 cmu wall on top of wide flanged beam

cmu wall on top of wide flanged beam
if i were to build a cmu wall on top of a w14x48 beam, how would i go about securing the wall to the beam?
dumecheng,
we usually weld 3/4" dia. headed steel studs (6" long)to the top flange and grout solid the bottom 3 courses of cmu. in addition, you could also provide steel angles welded to the top flange to maintain alignment at the bottom of the wall. good luck.
we have welded astm a706 reinforcing bars to the top flange of the beam, extending vertically the required development or splice distance. then the cmu is placed over the bars and grouted.
you can also use deformed bar anchors as made by nelson.
in the past, i have used weldable rebar in grouted cells at about 24" on center. the size and spacing of the rebar depend on the types of loads the wall will have to resist. a couple of other things to consider:
- can the loads on the wall cause the beam to twist or bend in the out of plane direction?
- is the wall cantilevered or is it braced at the top?
thanks for the help. this actually isnt a load bearing wall. it is to conceal a roof top airconditioning unit. so all it has to do is hold itself up and resist winds i suppose. also it is not braced on top.
since it sounds like the cmu wall is cantilevered off the beam, wind load on this wall is going to want to twist the w14x48. make sure this beam is sufficiently braced or is strong enough to resist the torsion that it may see.
yes, this is a concern as there is not much torsional stiffness in a wide flange.
the wall will only be about 3 rows of 8" cmu in height and about 16 feet in length (same length as the beam). the beam is bolted to the concrete roof deck and has a load bearing wall under the deck at each end. it has (2) c8x18.75 channels bolted perpendicular to the it. the channels are also bolted to the concrete roof deck and supported on the other end by a load bearing wall under the concrete deck. the unit is to rest on the two channels.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
cmu wall behavior as a deep beam huangyhg 产品功能分析 0 2009-09-08 09:38 AM
cantilever retaining wall or no huangyhg 产品功能分析 0 2009-09-07 10:39 PM
bond beam on cmu wall huangyhg 产品功能分析 0 2009-09-07 04:19 PM
beam to masonry wall huangyhg 产品功能分析 0 2009-09-07 03:08 PM
12 x 6.5x 38 thick x 41 residential basement i-beam con huangyhg 产品功能分析 0 2009-09-06 10:30 PM


所有的时间均为北京时间。 现在的时间是 06:55 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多