默认 delay between pouring columns and slabsbeams over

delay between pouring columns and slabs/beams over.
how much delay is required between pouring columns and pouring the slab and beams over?
we specify 24 hours. what do you specify and what problems have you seen when there is an insufficient break?
check out our whitepaper library.
no delay is required if the formwork is designed for the entire loading of both placements.
civilperson/tomfh,
if you are doing a multi storey it is a good idea to allow the columns to shrink a bit prior to placing the floors over, this helps minimise the column shrinkage effect on the height of the floors.
on a short building it wouldnt make any difference.
24 hours seems like a reasonable minimum.
strengthwise civilperson is 100% correct.
shrinkage of column does not occur until the forms are removed. if there is no removal of form, then the delay interval does not help for column shrinkage effect. if the column forms are removed, then the elevation set for the slab will have to be independent of the column to minimize the column shrinkage effect, (thickening the slab at the location of the column to make up the column shrink).
it is common practice to wait as autogenous shrinkage 鈥?self-desication 鈥?is unavoidable. the paste can reduce up to 25% in volume due to autogenous shrinkage only. not sure how this translates to the total concrete volume change. anyway, it is typical to wait for the columns to shrink before placing the slab.
aci 318 section 6.4.6 and commentary r6.4.6 deals with this.
aci-318 6.4.6 鈥?beams, girders, or slabs supported by columns or walls shall not be cast or erected until concrete
in the vertical support members is no longer
plastic.
r6.4.6 鈥?delay in placing concrete in members supported
by columns and walls is necessary to prevent cracking at the
interface of the slab and supporting member caused by
bleeding and settlement of plastic concrete in the supporting
i don't see any reason to wait except for the column to set up. typically columns have substantial reinforcement so the shrinkage will be small.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭



所有的时间均为北京时间。 现在的时间是 04:30 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多