rebar - floor pad
we have a combustion chamber/boiler - probably weighs about 60,000 lbs - that is to be placed on a concrete pad.
we were given back a plan view drawing showing the rebar placement. for the entire boiler room the spacing is 12" apart, but right at the feet of the chamber the spacing is 20". the feet on the chamber are somewhere between ~16"-18" square. they seem to stress the importance of this increased spacing too.
why is rebar spaced further apart at this point than everywhere else? i would think that at the loading points the rebar would be closer together. i am just curious, we do not do concrete and are rarely even shown the drawings so i am not saying this is wrong but i do find it interesting.
check out our whitepaper library.
maybe there is suppose to be a pad underneath each boiler's support that goes from the boiler to underneath the slab. maybe they dont want it to sit on the slab. this is slab on grade right?
aci 318 7.12 doesn't really apply to slabs on grade, but if i'm specifying steel, i use this as a minimum. note 18" min. spacing.
the only thing i can think of for the increased spacing is if holes for anchors are going to be drilled after the concrete is poured, so less likely to hit rebar when drilling? are the feet going to be attached to the slab?
coe,
yes, the slab is on grade.
aggie,
we do used anchors in the floor so that could be why. perhaps if they were to plan the rebar to be a safe distance inside the anchors the rebar becomes too close together - if that's possible.
forgive me if this is a silly suggestion, but could it be that those rebar below the chamber feet at 20"c/c are in addition to the ones 12"c/c?
they do not show any rebar at 12". they show in detail how the spacing changes for that one portion of the floor and made a note of it.
this is not critical as our job is the boiler, i was really just curious and wanted to hear your opinions. if i get the chance i will ask the guy who did the design, but that may not happen.
look forward to hearing any other thoughts though.
is the slab thickened at the of the chamber? are the bars that are 12" oc the same size as those under the feet?
ucfse,
the floor is thicker under the chamber - thickness increases from 6" thick to 12" thick. the rebar is 12" oc under the chamber and 20" apart around the support legs.
having the extra bars at the thickened area of the slab isn't unusual. when you have a slab on grade, it is common to thicken the edges or the areas that receive concentrated loads and add some bars. 20 inches is a bit farther than is really good, not necessarily for strength but there are other issues, such as cracking and limiting the crack width, with which to be concerned.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
partial rebar developmen huangyhg 产品功能分析 0 2009-09-15 11:31 AM
microwaves and rebar huangyhg 产品功能分析 0 2009-09-10 01:57 PM
greased rebar huangyhg 产品功能分析 0 2009-09-09 03:07 PM
flame cutting rebar huangyhg 产品功能分析 0 2009-09-09 12:15 PM
epoxy coated rebar huangyhg 产品功能分析 0 2009-09-08 10:38 PM


所有的时间均为北京时间。 现在的时间是 06:46 PM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多