默认 ying wall reinforcement to slab over

tying wall reinforcement to slab over
hi guys,
i have a situation where i designed a precast slab to sit on top of four walls and doweled in. the contractor has come back and said they would like to use some false formwork and cast the slab in-situ. my original design only tied the walls to the slab over by dowels and therefore designed as a simply supported slab. now, i will cog the top steel over so it laps with some welded wire fabric that i have used for crack control.
my question is, should i be concerned with the negative moment that may occur in the slab at the wall. i will assume the concrete will crack as soon as it becomes stressed and will then behave as a simply-supported slab (as per the original design). the contractor put to me that i should lap the wall steel with the bottom reinforcement but i don't think that this is required.
can anyone see anything wrong with this approach.
i usually use a top bar as though it is fixed at the corner. hook on the end and top bar lapped over the wwf and extended about 0.15 to 0.2 times the span length out.
you really don't want to allow moment cracking right there where you have the highest shear.

asixth,jae,
let's say that the crack formed directly over the support centreline (point of maximum negative moment).
the joint then acts as a pin and allows rotation - so it would then act as a simple support which has already been allowed for...
if it's a highly loaded slab i would agree that the detail would be worth checking, but if the negative service moment isn't going to cause visible cracking issues i would be happy with the additional restraint provided.
the crack doesn't always occur at the centerline. that is the problem. many times the crack is off the face of support (due to the interaction with the shear that is occurring) and you then have a problem.

agree with jae, due to combined effects of bending and shear, the cracks are likely to occur at somewhere beyond the wall face. even with the cracks, you can't assume the slab has became simply supported, because the reinforcement in the negative moment region might still working that would provides some moment capacity.
since you are going to re-design the slab from pc to cip, why not make it as end fixed? if you prefer the simply supported scheme better, would bond breaker help?
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
post tension slab rc wall huangyhg 产品功能分析 0 2009-09-15 01:42 PM
masonry wall on slab on grad huangyhg 产品功能分析 0 2009-09-10 12:57 PM
in enercalc masonry wall design, what is parapet heigh huangyhg 产品功能分析 0 2009-09-09 07:17 PM
foundation wall tied to s.o.g huangyhg 产品功能分析 0 2009-09-09 01:39 PM
foundation wall 40 feet below grade huangyhg 产品功能分析 0 2009-09-09 01:38 PM


所有的时间均为北京时间。 现在的时间是 06:46 AM.


于2004年创办,几何尺寸与公差论坛"致力于产品几何量公差标准GD&T | GPS研究/CAD设计/CAM加工/CMM测量"。免责声明:论坛严禁发布色情反动言论及有关违反国家法律法规内容!情节严重者提供其IP,并配合相关部门进行严厉查处,若內容有涉及侵权,请立即联系我们QQ:44671734。注:此论坛须管理员验证方可发帖。
沪ICP备06057009号-2
更多