默认 under strength concrete

under strength concrete
i have some piles that were to be placed with a fc' value of 27.5 mpa. the actual concrete breaks came in at 19.0 mpa.
the axial loads are 262 kn bearing on a 760 x 760 plate, so crushing is not an issue. the anchor bolts are 1000mm long. are there any other concerns that i have to be aware of with the reduced concrete stength?
is the low strength due to reduced cement content?
this may affect the sulphate resistance of the pile and the ability of the rebar to resist corrosion.
the ability of teh pile to resist horizontal shear and bending forces will be reduced.
9/27/02--to nicholi from mapestru--re weak concrete
1. agree with "jeg".
2. would add: concern for affect of weak bond between a.bs and concrete, ( unless ab's configuration negates need for good bond
3. would add: concern for weak side bearing between top regions of abs and concrete, which could result in gradual loss of shear continuity between concrete pile and plate, above, and gradual deterioration of structural integrety of top of pile;
4. if piles are already in place: in view of the approx. 1/3 loss of specified concrete strength,---i would think in terms of developing some form of special reinforcement of the top regions of the piles, and/or the pile-superstructure interface regions,( possibly encasement in some form of epoxy bound fiber-reinforced structural plastic wrapping ?).
5. if the piles are not yet driven in place: i would think it not unreasonable to require new, --- properly fabricated piles to be provided by the contractor.
6. remember: piles are part of the foundation, and if they do deteriorate fast, they will be almost unreachable for repair, after all construction is finished.
7. good luck.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
concrete sampling guidlines huangyhg 产品功能分析 0 2009-09-08 12:34 PM
concrete mix= reinfocing for exterior composit deck huangyhg 产品功能分析 0 2009-09-08 12:19 PM
concrete compressive strength huangyhg 产品功能分析 0 2009-09-08 11:53 AM
chapter 4 preliminary design properties of concrete huangyhg 产品功能分析 0 2009-09-07 11:23 PM
28 day vs. 56 day concrete breaks huangyhg 产品功能分析 0 2009-09-07 08:34 AM