默认 anchor bolt failure due to concrete breakou

anchor bolt failure due to concrete breakout
i have a very large lateral load (111k service load) that i'm trying to transfer from my anchor bolts into a 30"x36" reinforced concrete pier. i've tried checking concrete breakout according to the aci appendix d and don't seem to be getting anywhere near the capacity i need. i'm at crossroads on where to go from here. is there any design guides untilizing my pier reinforcing? thanks
check out our whitepaper library.
i don't think it's a good idea to transfer that much shear using anchor bolts. what other options have you tried, such as a shear lug or embedded plate?
for large lateral loads, i prefer two embedded plates, one below each side of the base plate. vertically oriented plates are welded in the field to the edges of the base plate and the top of the embedded plates. with this solution, the base plate is still elevated on a bed of non-shrink grout.
daveatkins
the shear capacity of the embeds depends lot on their distance from the free end, on the concrete strength, the spacing, etc. the amount of shear that you are trying to transfer seems really high. to make you feel better, you probably can check the numbers from hand calculation with a software (profice) available for free down load from hilti web site.
if it helps.
i started with trying to get anchor bolts to work and i guess that doesn't sound like the best option where can i find information on design of shear lugs or embed plates as daveatkins suggests? i like the embed plate idea but wouldn't have a clue on where to start. i think that is really my only option at this point.
you can download one of the aisc design guides from aisc.org. one of the design guides (i do not re
can the 30x36 in pier handle the shear load. 111k service is about 150k factored and the pier as a capacity of about 90k without stirrups. make sure the pier can transfer the load into footing. it will be hard to make the embed to work in the pier does not work
yes, i've check the shear capacity w/ stirrups about 10 times and it works. i've also checked the load transfer from the pier to the footing using the shear-friction design method specified by the aci. that indeed works too.
if you use an embedded plate with headed welded studs, the pci handbook has information on calculating the capacity of a stud group welded to a plate. plate thickness is based on the stud diameter, and the pci method takes into account spacing and edge distance.
daveatkins
aci appendix d doesnt apply since you have reinforcing in the pier breakout will not happen like it would for unreinforced concrete. see aisc design guides 1 and 7. if you use a shear lug make sure you can fit your ties around it at the top of the pier.
__________________
借用达朗贝尔的名言:前进吧,你会得到信心!
[url="http://www.dimcax.com"]几何尺寸与公差标准[/url]
huangyhg离线中   回复时引用此帖
GDT自动化论坛(仅游客可见)
回复


主题工具 搜索本主题
搜索本主题:

高级搜索
显示模式

发帖规则
不可以发表新主题
不可以回复主题
不可以上传附件
不可以编辑您的帖子

vB 代码开启
[IMG]代码开启
HTML代码关闭

相似的主题
主题 主题发起者 论坛 回复 最后发表
air entrained concrete vs. non air entrained concrete huangyhg 产品功能分析 0 2009-09-07 10:24 AM
aci appedix d concrete pryout strength d.6.3 huangyhg 产品功能分析 0 2009-09-07 09:54 AM
30mpa parking garage concrete slab vs. 35mpa huangyhg 产品功能分析 0 2009-09-07 08:39 AM
3000 psi concrete requiremen huangyhg 产品功能分析 0 2009-09-07 08:39 AM
28 day vs. 56 day concrete breaks huangyhg 产品功能分析 0 2009-09-07 08:34 AM